{
  "schema_version": "1.0.0",
  "id": "batch05-coke_county_uwcd-ea5b3c9fbf55",
  "record_state": "release_candidate",
  "document_type": "public_hearing_and_called_meeting_minutes",
  "meeting": {
    "meeting_id": "batch05-coke_county_uwcd-ea5b3c9fbf55",
    "district_id": "coke_county_uwcd",
    "district_name": "Coke County Underground Water Conservation District",
    "meeting_date": "2025-09-30",
    "approved_date": null,
    "date_note": "Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
    "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
    "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf",
    "page_count": 1,
    "evidence": [
      {
        "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
        "page": 1,
        "page_basis": "physical PDF page, one-based",
        "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
        "evidence_method": "PDF_PAGE_REFERENCE",
        "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#source-heading",
        "object_id": "source-heading",
        "json_pointer": "/meeting"
      }
    ],
    "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#source-heading",
    "json_pointer": "/meeting"
  },
  "meeting_summary": "Coke County minutes report a motion and announced rule amendment reducing property-line spacing from 330 to 50 feet, with a conditional construction option as close as 5 feet. Membership, email and office/website expenses were approved. The rule paragraph does not give a separate vote tally.",
  "meeting_summary_evidence": [
    {
      "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
      "page": 1,
      "page_basis": "physical PDF page, one-based",
      "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
      "evidence_method": "PDF_PAGE_REFERENCE",
      "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#meeting-summary",
      "object_id": "meeting-summary",
      "json_pointer": "/meeting_summary"
    }
  ],
  "entities": [
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-001",
      "name": "Wes Washam",
      "type": "person",
      "roles": [
        "President; present; signatory"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-001",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-001",
          "json_pointer": "/entities/0"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-001",
      "json_pointer": "/entities/0",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-002",
      "name": "Mike Arrott",
      "type": "person",
      "roles": [
        "Vice President; present; mover"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-002",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-002",
          "json_pointer": "/entities/1"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-002",
      "json_pointer": "/entities/1",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-003",
      "name": "Jimmie Byrne",
      "type": "person",
      "roles": [
        "Secretary; present; mover"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-003",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-003",
          "json_pointer": "/entities/2"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-003",
      "json_pointer": "/entities/2",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-004",
      "name": "Mike Pinnard",
      "type": "person",
      "roles": [
        "Director; present; mover"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-004",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-004",
          "json_pointer": "/entities/3"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-004",
      "json_pointer": "/entities/3",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-005",
      "name": "Jnae Walls",
      "type": "person",
      "roles": [
        "Manager; present; signatory"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-005",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-005",
          "json_pointer": "/entities/4"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-005",
      "json_pointer": "/entities/4",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-006",
      "name": "Tim Smith",
      "type": "person",
      "roles": [
        "Named seconder/mover in body"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-006",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-006",
          "json_pointer": "/entities/5"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-006",
      "json_pointer": "/entities/5",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-007",
      "name": "Joseph Wink",
      "type": "person",
      "roles": [
        "Public attendee; owner of Wink Drilling"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-007",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-007",
          "json_pointer": "/entities/6"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-007",
      "json_pointer": "/entities/6",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-008",
      "name": "Wink Drilling",
      "type": "organization",
      "roles": [
        "Joseph Wink ownership"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-008",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-008",
          "json_pointer": "/entities/7"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-008",
      "json_pointer": "/entities/7",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-009",
      "name": "Texas Dept of Licensing and Regulation",
      "type": "organization",
      "roles": [
        "Rule-distance compliance reference"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-009",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-009",
          "json_pointer": "/entities/8"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-009",
      "json_pointer": "/entities/8",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-010",
      "name": "TAGD, Texas Association of Groundwater Districts",
      "type": "organization",
      "roles": [
        "Membership"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-010",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-010",
          "json_pointer": "/entities/9"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-010",
      "json_pointer": "/entities/9",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-011",
      "name": "CTTC",
      "type": "organization",
      "roles": [
        "Email provider"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-011",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-011",
          "json_pointer": "/entities/10"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-011",
      "json_pointer": "/entities/10",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-012",
      "name": "Coke County",
      "type": "organization",
      "roles": [
        "Office rent/website costs"
      ],
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-012",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-entities-012",
          "json_pointer": "/entities/11"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-entities-012",
      "json_pointer": "/entities/11",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    }
  ],
  "water_objects": [
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-water_objects-001",
      "type": "regulatory_rule",
      "label": "CCUWCD rule 5.102b",
      "condition": "Closer 5-foot option is tied to stated annular-space and grouting construction conditions; historical minute text does not establish present rule status.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-water_objects-001",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-water_objects-001",
          "json_pointer": "/water_objects/0"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-water_objects-001",
      "json_pointer": "/water_objects/0",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    }
  ],
  "episodes": [
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-001",
      "topic": "Rule 5.102b spacing amendment",
      "stage": "recorded_motion",
      "statement": "Jimmie Byrne moved to change the property-line distance from 330 ft to 50 ft. The minutes state the amended rule will allow a water well 50 feet from property lines with minimum well construction requirements, or up to 5 feet if the annular space is 3 inches larger than the outside casing diameter and pressure cemented/grouted from 100 feet back to surface or from the top of production zone, whichever is shallower. No separate second or vote tally appears for this paragraph.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-001",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-001",
          "json_pointer": "/episodes/0"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-001",
      "json_pointer": "/episodes/0",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-002",
      "topic": "Administrative expenses",
      "stage": "recorded_approval",
      "statement": "TAGD membership continued on Byrne motion/Tim Smith second unanimously; CTTC email continued on Arrott motion/Pinnard second unanimously; office rent and website costs approved on Pinnard motion/Smith second unanimously. Office/website amounts are not printed.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-002",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-002",
          "json_pointer": "/episodes/1"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-002",
      "json_pointer": "/episodes/1",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-003",
      "topic": "Next meeting",
      "stage": "scheduled",
      "statement": "Tim Smith moved to set November 11, 2025 at 5 PM as next regular meeting; Mike Arrott seconded; unanimous. Adjournment motion Arrott/Byrne passed unanimously at 5:31 PM.",
      "section_date": "2025-09-30",
      "date_status": "recorded_action_on_meeting_date; future_event_date_retained_in_statement",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-003",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-003",
          "json_pointer": "/episodes/2"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-episodes-003",
      "json_pointer": "/episodes/2",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "explicit_section_date",
        "date_note": "Supported date of this section only; not a resolution of the whole-document date.",
        "date_candidates": []
      }
    }
  ],
  "quantities": [
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-001",
      "subject": "Former property-line distance",
      "role": "reported_prior_requirement",
      "value": 330,
      "unit": "ft",
      "time_basis": null,
      "qualifier": "Preserve the full construction condition and whichever-is-shallower alternative; distances are not additive.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-001",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-001",
          "json_pointer": "/quantities/0"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-001",
      "json_pointer": "/quantities/0",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-002",
      "subject": "Amended property-line distance",
      "role": "announced_rule_amendment",
      "value": 50,
      "unit": "ft",
      "time_basis": null,
      "qualifier": "Preserve the full construction condition and whichever-is-shallower alternative; distances are not additive.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-002",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-002",
          "json_pointer": "/quantities/1"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-002",
      "json_pointer": "/quantities/1",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-003",
      "subject": "Conditional closer property-line distance",
      "role": "conditional_rule_option",
      "value": 5,
      "unit": "ft",
      "time_basis": null,
      "qualifier": "Preserve the full construction condition and whichever-is-shallower alternative; distances are not additive.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-003",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-003",
          "json_pointer": "/quantities/2"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-003",
      "json_pointer": "/quantities/2",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-004",
      "subject": "Annular space relative to casing outside diameter",
      "role": "condition",
      "value": 3,
      "unit": "inches larger",
      "time_basis": null,
      "qualifier": "Preserve the full construction condition and whichever-is-shallower alternative; distances are not additive.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-004",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-004",
          "json_pointer": "/quantities/3"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-004",
      "json_pointer": "/quantities/3",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-005",
      "subject": "Grout depth alternative",
      "role": "condition",
      "value": 100,
      "unit": "feet",
      "time_basis": null,
      "qualifier": "Preserve the full construction condition and whichever-is-shallower alternative; distances are not additive.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-005",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-005",
          "json_pointer": "/quantities/4"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-005",
      "json_pointer": "/quantities/4",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-006",
      "subject": "TAGD membership",
      "role": "approved_expense",
      "value": 870,
      "unit": "USD",
      "time_basis": "annual; 2025-2026 membership",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-006",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-006",
          "json_pointer": "/quantities/5"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-006",
      "json_pointer": "/quantities/5",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    },
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-007",
      "subject": "CTTC email",
      "role": "approved_expense",
      "value": 64.41,
      "unit": "USD",
      "time_basis": "annual",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-007",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-007",
          "json_pointer": "/quantities/6"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-quantities-007",
      "json_pointer": "/quantities/6",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    }
  ],
  "tables": [],
  "relationships": [
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-relationships-001",
      "subject": "Joseph Wink",
      "predicate": "owner_of",
      "object": "Wink Drilling",
      "identity_scope": "source_document_only",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-relationships-001",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-relationships-001",
          "json_pointer": "/relationships/0"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-relationships-001",
      "json_pointer": "/relationships/0",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    }
  ],
  "unresolved": [
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-unresolved-001",
      "statement": "Tim Smith appears in recorded motions but not in the listed attendees; no identity or attendance correction is inferred. The rule amendment paragraph lacks an explicit vote count.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-unresolved-001",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-unresolved-001",
          "json_pointer": "/unresolved/0"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-unresolved-001",
      "json_pointer": "/unresolved/0",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    }
  ],
  "unavailable_references": [
    {
      "id": "batch05-coke_county_uwcd-ea5b3c9fbf55-unavailable_references-001",
      "description": "Earlier rule text beyond the quoted amendment and supporting budgets are not attached.",
      "evidence": [
        {
          "source_document_id": "sha256:ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
          "page": 1,
          "page_basis": "physical PDF page, one-based",
          "source_url": "https://www.co.coke.tx.us/upload/page/0192/UW%20Min%20signed%209%2030%2025.pdf#page=1",
          "evidence_method": "PDF_PAGE_REFERENCE",
          "claim_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-unavailable_references-001",
          "object_id": "batch05-coke_county_uwcd-ea5b3c9fbf55-unavailable_references-001",
          "json_pointer": "/unavailable_references/0"
        }
      ],
      "citation_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55#batch05-coke_county_uwcd-ea5b3c9fbf55-unavailable_references-001",
      "json_pointer": "/unavailable_references/0",
      "date_context": {
        "date": "2025-09-30",
        "date_role": "recorded_meeting_date",
        "date_note": "Document context only: Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
        "date_candidates": []
      }
    }
  ],
  "provenance": {
    "source_schema": "batch02-source-bounded-1.0",
    "source_record_state": "source_bounded_extraction",
    "human_reviewed": null,
    "original_public_release_authorized": null,
    "review_scope": "Source-bounded extraction; reading descriptions retained as reported provenance, not independently assigned page methods or human review.",
    "reported": {
      "batch": "05",
      "priority": 2,
      "sha256": "ea5b3c9fbf5532abe5bf383217b7560b62c7dc5c966f6ecd6a13fb8ef6d1262f",
      "scope": "Only the complete supplied PDF; no external retrieval, current-status verification or prior-corpus identity matching.",
      "extraction_date": "2026-09-18",
      "page_review": [
        {
          "page": 1,
          "reviewed": true,
          "content": "Signed September 30, 2025 minutes including rule 5.102b, expenses and next meeting.",
          "method": "Full physical-page visual reading of locally rendered PDF; native text consulted where available"
        }
      ],
      "read_completeness": "All physical pages visually read, including attachments, filing sheets and tables. Localized qualifications are recorded in unresolved entries; no whole page was skipped."
    }
  },
  "record_format": "batch02",
  "canonical_url": "https://texaswatersources.com/groundwater-districts/intelligence/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55",
  "json_url": "https://texaswatersources.com/data/water-watch/v1/meetings/batch05-coke_county_uwcd-ea5b3c9fbf55.json",
  "publisher": "Texas Water Sources",
  "collection_role": "source_linked_research_not_official_registry",
  "dates": {
    "source_date": "2025-09-30",
    "source_date_basis": "Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date.",
    "routing_date": null,
    "extraction_date": "2026-09-18",
    "last_source_check": null,
    "publication_date": null,
    "document_label": "Minutes",
    "date_role": "recorded_meeting_date",
    "date_note": "Meeting September 30, 2025; signatures are undated. November 11 is the next scheduled meeting, not approval date."
  },
  "partial_pages": [],
  "correction_notes": [
    "Original extraction unchanged. Archive-relative PDF filename excluded; supported content retained. Page references are not quotations or image-method evidence."
  ],
  "content_version": "a05fd78e0a3deb9d6542e69c134caea75f45516250d04d3cb525319f2cb4c5ec"
}
