Texas Water Watch

Coverage and source-check status

What is collected, what was checked, what remains unread, and what changed in the published research.

Frozen operational snapshot captured . This is not a government event date, source check or publication time.

The current collection release is PR #41. The frozen check snapshot describes the earlier 141-document PR #39 collection. Three additional North Plains readings were separately accepted at 2026-09-29T06:11:29.798308Z; three other North Plains sources remain deferred. This reading overlay does not imply another source check. Actual PR #41 promotion and verification are recorded in its separate release receipt.

Later checks and published research

Update snapshot captured . Additive later updates; the September frozen source-watch snapshot, original reading flags, collection identities and deferred inputs below are preserved. Page checks, reading acceptance and website publication are separate activities.

October 28: two bounded outcome checks

These are checks of five official pages, not full district monitoring, complete source readings or new meeting records.

Kinney County: Fort Clark MUD

Outcome not verified · checked .

The checked October 27 page lists the agenda and two technical attachments. No minutes or Fort Clark MUD amendment disposition was located on these checked pages. This does not establish that no meeting or action occurred.

Official board-meeting index and October 27 meeting page only; not a full district archive crawl or a source-watch run.

Northern Trinity: rulemaking

Outcome not verified · checked .

The checked pages still link the October 27 notice and proposed rule amendments; no October 27 adoption instrument or outcome was located there. The meetings page itself still calls October 27 upcoming. A stale heading or older rule compilation does not establish the outcome. This check does not extend Resort permit/enforcement status beyond the separate October 18 evidence boundary.

Official meetings, forms/documents and news pages only; not a new matter watch, complete rereading or statewide source check.

Publication receipts, separate from government events

September 29: three historical North Plains readings · published ; verified .

Three accepted infill readings were published and reconciled September 29. The original acceptance flags are retained historical input, not the final publication state. Other deferred sources were not processed.

October 26: Resort supplement and Kinney notice · published ; verified .

October 26 supplied-record Resort supplement and Kinney notice publication. Historical acquisition/review and website publication are not new government decisions. Resort district-response status remains bounded through October 18.

The retained PR #41 reconciliation receipt preserves three other deferred North Plains sources and the Northern Trinity state. No queue, receipt or source-watch result is changed by these page checks. This is not a new audit of either queue.

October 26 Resort supplement: the district-response status ends October 18. A newer website publication or this page check does not extend that boundary.

Collection coverage

144 source documents across 98 of 98 identities in the current district directory: 141 PDFs covering 1177 physical pages and 3 native documents. This is representation in a research collection, not a complete or current history of every district.

Other evidence layers remain separate: 182 Facts, 60 Board Actions, 88 tentative research leads and 2 source-linked matters. Counts from different layers cannot be added to estimate government events.

District-by-district document counts and links · Browse the district directory

Choose a district

See the source roles and dates actually represented here. The selector does not download detailed statewide search or entity mentions.

Select a district to inspect this collection’s evidence and any published manual check history.

Published research changes

The collection release is PR #41. The North Plains matter retains the June update and adds historical January, March and April evidence; the Resort matter retains its own earlier research release. Website publication is not a government-source check or a new event.

PR #39 Worker promotion: (Cloudflare tws-production Worker version became active); public verification: . These are publication evidence, not district event or source-check dates.

Earlier June reporting-answer revision (PR #39)

The earlier answer found no unconditional reporting resolution. Minutes for the historical meeting add that alternative 2025 metering methods were described as submitted, with no later motion recorded there. Submission is not acceptance, and the separate late-2023 reporting issue was not closed by this evidence.

June now supports reported submission of methods, while the actual instrument and sufficiency determination remain unavailable. Preserve the original conclusion ID and all old comparison evidence. Revised conclusion · Exact prior/revised answers · June event · June source item.

The separate Northern Trinity district-data release added two complete readings without changing the Resort matter or establishing a September outcome.

One source-context correction beside a legacy Fact

The 305.6 acre-feet Fact keeps its original value and broad classification. The retained Southwestern Travis minutes, physical page 5, describe the figure as approximately 305.6 acre-feet of reported production for FY2026 to date; no action was taken on that report item.

Download this small coverage/status snapshot (JSON) · All data downloads