Meeting intelligence · Agenda and supporting material

Hill Country Underground Water Conservation District

Scheduled date

This notice or agenda does not establish that the scheduled event occurred or that proposed actions were approved.

Date context: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.

Source-linked research summary. Verify important details against the official district record.

Meeting summary

Hill Country notices a September 1, 2026 budget/tax hearing and board meeting, including possible selection of a firm for an Edwards-Trinity to Ellenburger-San Saba connectivity study and drought/aquifer-monitoring reports. No outcomes are recorded.

Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Source and dates

Meeting date · source stated
2026-09-01
Document approval date
Unknown / not stated
Routing metadata date
Unknown
Extraction date
2026-09-18
Last official source check
Unknown / no new source check performed
Source document
1 physical pages · batch05-hill_country_uwcd-93f7c2af8f25

PDF page fragments are navigation hints; some viewers may open at the beginning.

Source identity: sha256:93f7c2af8f25c8d31560f6056d02e797cd9d445adb7ce42dfaa7de5025c8b48c

Source completeness

All physical pages visually read, including attachments, filing sheets and tables. Localized qualifications are recorded in unresolved entries; no whole page was skipped.

Explore Entities and timelines · Dated mentions, without assumed identity merges.

Matters, observations and decisions

Requests, recommendations and approvals retain their recorded labels. A passed motion is a procedural result; conditions are requirements, not proof of fulfillment. Repeated quantities are not added together.

Connectivity study

scheduled

Link to this item
topic
Connectivity study
stage
scheduled
statement
Discussion and possible action on selecting a firm to assist in the named integrated hydrogeologic connectivity study is listed. No firm, contract or result is supplied.
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01
Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Drought and monitoring

scheduled

Link to this item
topic
Drought and monitoring
stage
scheduled
statement
Agenda calls to update board and approve drought conditions report and update aquifer monitoring program; the reports and measurements are absent.
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01
Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Finance and governance

scheduled

Link to this item
topic
Finance and governance
stage
scheduled
statement
Public comment on proposed FY 2026-2027 budget (October 2026-September 2027) and 2026 tax rate; possible budget/rate adoption, August 11 minutes consent agenda and independent auditor report for year ended September 30, 2025. No amounts or decisions supplied.
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01
Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Wells, permits and water-domain objects

Integrated Hydrogeologic Study to Evaluate Edwards-Trinity (Plateau) to Ellenburger-San Saba Hydraulic Connectivity in Gillespie County, Texas

Link to this item
type
project
label
Integrated Hydrogeologic Study to Evaluate Edwards-Trinity (Plateau) to Ellenburger-San Saba Hydraulic Connectivity in Gillespie County, Texas
aquifers 1
Edwards-Trinity (Plateau)
aquifers 2
Ellenburger-San Saba
stage
scheduled selection of firm
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01

Statement basis: scheduled selection of firm

Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Edwards-Trinity (Plateau)

Link to this item
type
aquifer
label
Edwards-Trinity (Plateau)
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01

Statement basis: source-linked item

Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Ellenburger-San Saba

Link to this item
type
aquifer
label
Ellenburger-San Saba
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01

Statement basis: source-linked item

Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Unresolved questions

No additional unresolved questions recorded. This does not establish completeness.

Named entities and meeting-local relationships

Names remain as stated in each source. Similar names across meetings are not merged. Candidate relationships remain hypotheses.

Paul Babb

Link to this item
name
Paul Babb
type
person
roles 1
General Manager
identity scope
source document only
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01

Statement basis: source document only

Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Integrated hydrogeologic study · evaluates_connectivity_between

Link to this item
subject
Integrated hydrogeologic study
predicate
evaluates connectivity between
object
Edwards-Trinity (Plateau) and Ellenburger-San Saba aquifers
identity scope
source document only
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01

Statement basis: source document only

Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Unavailable referenced material

Unavailable reference

Link to this item
description
Study/proposals, drought and monitoring reports, August 11 minutes, budget and independent auditor report are referenced but not attached.
Date context
Document context only: September 1 is scheduled hearing/meeting, not recorded outcome; August 11 refers to prior minutes.
Document / item context date
2026-09-01

Statement basis: source-linked item

Source evidence · p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.