Meeting intelligence · Minutes
Northern Trinity Groundwater Conservation District
Source meeting date
Date context: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
Source-linked research summary. Verify important details against the official district record.
Meeting summary
The board issued Everman a major violation with $0 civil penalty, approved Bedford and Lynn Creek amounts, and authorized drilling Resort Wells 7/8 with no extra production and conditions for later use/modeling. It retained Timarron authorization without reimbursement or credit.
Source evidence · physical p. 5, physical p. 6, physical p. 7, physical p. 8, physical p. 10, physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Source and dates
- Meeting date · source stated
- 2026-04-08
- Document approval date
- 2026-06-02
- Routing metadata date
- Unknown
- Extraction date
- 2026-09-24T23:34:07.537256+00:00
- Last official source check
- 2026-09-24T21:08:13.491855+00:00
- Source document
- 11 physical PDF pages · pilot-ntgcd-aqua-resort-c89ef649d5bd
Source date roles and qualifications
2026-04-08 · meeting — heading and recorded proceedings
Source evidence · physical p. 1
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-06-02 · minutes approval — approval block, separately from meeting
Source evidence · physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Posting, filing, signature, approval, study and referenced dates retain their own roles. They do not automatically conflict with the meeting date.
PDF page fragments are navigation hints; some viewers may open at the beginning.
Source identity: sha256:c89ef649d5bdc88a9ad0ba4e96d7f783d87b6fc0a6a79ad647c0b8c3c86724f7
Source completeness
All physical pages visually read. Supplied black signature redactions cannot be recovered. Pale text and ambiguous printed values are qualified in unresolved entries; no independent reviewer verification claimed.
- source acquired at
- 2026-08-05T22:21:16.767783Z
- source checked at
- 2026-09-24T21:08:13.491855+00:00
- source check basis
- carried unchanged from supplied acquisition manifest; no new source availability check
Explore Entities and timelines · Dated mentions, without assumed identity merges.
Matters, observations and decisions
Requests, recommendations and approvals retain their recorded labels. A passed motion is a procedural result; conditions are requirements, not proof of fulfillment. Repeated quantities are not added together.
Hearing sequence
recorded procedure
Link to this item- topic
- Hearing sequence
- stage
- recorded procedure
- statement
- Complaint hearing opened 2:00 PM, adjourned 2:28 PM; permit hearing 2:28–3:04 PM; regular meeting opened 3:04 PM and adjourned 3:57 PM. Quorum established. Complaint under Texas Water Code 36.119(g), Chapter 36, Texas Government Code Chapter 551 and district rules; audio designated official proceeding record. Original electronic notice March 5, additional notice March 27 for rescheduled hearing; notice requirements reported satisfied.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 1, physical p. 2, physical p. 5, physical p. 9, physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Helton complaint
allegation
Link to this item- topic
- Helton complaint
- stage
- allegation
- statement
- Helton testified his approximately 14-acre rental property adjacent to Everman was flooded twice in past year, through pasture/stock tank/lower pasture. Requested assurance future malfunction would not flood it; he does not reside there.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Everman response
party position
Link to this item- topic
- Everman response
- stage
- party position
- statement
- Spencer acknowledged burst chlorine line and flapper-valve malfunction; denied willful/negligent waste and asserted existing permitted/grandfathered design. Facility described as constructed 1962; wells then unused pending remedy. Planned rerouting west to Southway Drive stormwater/creek, against natural east drainage. Ramirez described daily inspections; SCADA monitored flow/volume but did not detect chlorine-line or valve failures. City intended corrective project, not evidence completed here.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 2, physical p. 3, physical p. 4
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Waste recommendation
staff and counsel assessment
Link to this item- topic
- Waste recommendation
- stage
- staff and counsel assessment
- statement
- GM assessed overflow close to boundary and directed to Helton land as potential negligent design/waste, citing District Rule (rr), and recommended redirecting discharge. Embrey similarly opined design allowed groundwater escape to neighboring land and met waste definition. City disagreed. Rule 8.2 and Water Code 36.119(g) also cited.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 3, physical p. 4
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Everman complaint disposition
board enforcement decision
Link to this item- topic
- Everman complaint disposition
- stage
- board enforcement decision
- statement
- Konen first recommended $500 first-major-violation civil penalty; Merritt suggested waiver given corrective efforts. Konen moved a major violation with $0 civil penalty; Merritt seconded; unanimous. Zero penalty does not erase the recorded major violation.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 5
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford permit
board approval
Link to this item- topic
- Bedford permit
- stage
- board approval
- statement
- Adrian Dias discussed historical/grandfathered-period use and intermittent well operation. Merritt moved approval of “Operating Permit” for 146,205,000 gallons annually; Hamilton seconded; unanimous. Heading and GM introduction call it Grandfathered Use Permit; retain this wording mismatch.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek
board approval
Link to this item- topic
- Lynn Creek
- stage
- board approval
- statement
- GM described site visit and well drilled in 1980s or 1990s, with no well log located, likely due to age. Konen moved operating permit for 6,500,000 gallons annually; Merritt seconded; unanimous.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort operating application
request
Link to this item- topic
- Resort operating application
- stage
- request
- statement
- Application again requests four additional wells and 67,863,203 annual gallons beyond existing grandfathered production, proposed total 123,090,203 gallons annually; not a new increment to be added to February request.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort supply and measurements
attributed report
Link to this item- topic
- Resort supply and measurements
- stage
- attributed report
- statement
- GM summarized applicant account that Fort Worth interconnect was being phased out and system anticipated relying entirely on groundwater. GM said hydrogeologic-report inconsistencies were addressed and 24-hour static water-level measurements supplied. Van Hattem said transition was not by choice, Aqua does not provide fire flow and Fort Worth previously did not provide it either; discussed TCEQ well-approval timing. These minutes report submission, not independent data validation or utility corroboration.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort technical recommendation
staff recommendation
Link to this item- topic
- Resort technical recommendation
- stage
- staff recommendation
- statement
- GM said analysis indicated possible unreasonable neighboring-well impacts and only reasonable current option was wells 7/8 (island wells) with no increased production. McDonald said existing wells 5/6 relatively low producing and new wells could bring system closer to current authorized production; concerns particularly about well 10 proximity to existing well.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort drawdown review
modeled prediction
Link to this item- topic
- Resort drawdown review
- stage
- modeled prediction
- statement
- John Ellis described projected additional drawdown around 20–60 feet for Paluxy and 40–95 feet for Twin Mountains under requested additional pumping. Levels in some cases near/within screened intervals; uncertainty in confined/unconfined Twin Mountains behavior. Current model assumes confined Twin Mountains and unconfined Paluxy. McDonald said analytical solution uses model-derived aquifer characteristics and unconfined conditions could reduce simulated drawdown. These are simulated impacts, not measured drawdown from authorized operation; no prediction horizon stated.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort Wells 7 and 8
board limited drilling authorization
Link to this item- topic
- Resort Wells 7 and 8
- stage
- board limited drilling authorization
- statement
- Konen moved to approve ability to drill wells 7/8 with no additional authorized production. If drilled, Aqua must seek a permit amendment at subsequent hearing to utilize them. Motion also requires the discussed 3D modeling to assess impacts/drawdown of proposed wells and requested production before consideration of continued permit request. Hamilton seconded; unanimous. This does not authorize their use under a production amendment or approve wells 9/10.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort procedure and risk
counsel advice
Link to this item- topic
- Resort procedure and risk
- stage
- counsel advice
- statement
- Embrey advised amendment to incorporate new wells requires proper notice/public hearing; drilling at applicant risk because future amendment to utilize wells is not guaranteed and could be contested. Van Hattem said drilling could improve instantaneous capacity and provide two model-calibration data points, without increasing permitted annual production.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Consent agenda
board approval
Link to this item- topic
- Consent agenda
- stage
- board approval
- statement
- Merritt moved consent agenda including February 12 minutes, budget/investment statements, invoices and reimbursement; Hamilton seconded; unanimous. No items pulled or public comment.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 9, physical p. 10
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Timarron production/credit alternatives
request
Link to this item- topic
- Timarron production/credit alternatives
- stage
- request
- statement
- Zauber said original estimated 25,000,000 annual gallons exceeded actual 2024/2025 metered use. Options: increase authorization to 15,000,000 with credit for difference from estimated usage; keep current authorization with credit; or other compromise including credit. Current authorized amount not numerically supplied. Meter replacement in 2024 followed inaccurate field tests. GM said affidavit reporting back to January 2019, not grandfathered period ending 2018, and wells out of compliance before 2023 registration.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 10
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Timarron
board decision
Link to this item- topic
- Timarron
- stage
- board decision
- statement
- Konen moved retention of current grandfathered authorized amount with no reimbursement/credit for past production costs; if monitoring shows need, association may seek operating permit for more production. Merritt seconded; unanimous. Does not approve requested 15,000,000 alternative.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
District reports
report
Link to this item- topic
- District reports
- stage
- report
- statement
- GM compliance update no action; GM and Ellis GMA 8 timelines/next steps; staffing/new hire, Newby Mansfield realtor-class recap, rain gauges for Euless Water Department Arbor Daze, newsletter; no board-report action and GM to poll future meeting dates.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2026-04-08
Source evidence · physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Quantities, roles and time bases · 30 values
Quantities, roles and time bases
Requested, recommended, historic, modeled and approved values retain their separate roles. A null time basis does not remove a time dimension already present in the unit.
Helton property · complainant stated area
Link to this item- subject
- Helton property
- role
- complainant stated area
- value
- 14
- unit
- acres
- time basis
- Unknown / not stated
- approximate
- true
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: complainant stated area
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Helton property · alleged recent flood occurrences
Link to this item- subject
- Helton property
- role
- alleged recent flood occurrences
- value
- 2
- unit
- events
- time basis
- past year
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: alleged recent flood occurrences
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
City of Everman · recommended civil penalty
Link to this item- subject
- City of Everman
- role
- recommended civil penalty
- value
- 500
- unit
- USD
- time basis
- Unknown / not stated
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: recommended civil penalty
Source evidence · physical p. 5
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
City of Everman · board assessed civil penalty
Link to this item- subject
- City of Everman
- role
- board assessed civil penalty
- value
- 0
- unit
- USD
- time basis
- Unknown / not stated
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: board assessed civil penalty
Source evidence · physical p. 5
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford well system · requested annual production
Link to this item- subject
- Bedford well system
- role
- requested annual production
- value
- 146,205,000
- unit
- gallons
- time basis
- year
- allocation scope
- system
- aggregation warning
- Application listing and decision values are distinct roles, not additive.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: requested annual production
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford well system · board approved annual production
Link to this item- subject
- Bedford well system
- role
- board approved annual production
- value
- 146,205,000
- unit
- gallons
- time basis
- year
- allocation scope
- system
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: board approved annual production
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford well system — N-2016-1113 · listed production capacity
Link to this item- subject
- Bedford well system — N-2016-1113
- role
- listed production capacity
- value
- 800
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford well system — N-2018-0685 · listed production capacity
Link to this item- subject
- Bedford well system — N-2018-0685
- role
- listed production capacity
- value
- 600
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek SMI · requested annual production
Link to this item- subject
- Lynn Creek SMI
- role
- requested annual production
- value
- 6,500,000
- unit
- gallons
- time basis
- year
- allocation scope
- well
- aggregation warning
- Application listing and decision values are distinct roles, not additive.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: requested annual production
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek SMI · board approved annual production
Link to this item- subject
- Lynn Creek SMI
- role
- board approved annual production
- value
- 6,500,000
- unit
- gallons
- time basis
- year
- allocation scope
- well
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: board approved annual production
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek SMI — N-2026-0018 · listed production capacity
Link to this item- subject
- Lynn Creek SMI — N-2026-0018
- role
- listed production capacity
- value
- 45
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain · requested additional annual production
Link to this item- subject
- The Resort at Eagle Mountain
- role
- requested additional annual production
- value
- 67,863,203
- unit
- gallons
- time basis
- year
- allocation scope
- system
- aggregation warning
- Repeated appearances are the same stated increment, not additional cumulative requests.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: requested additional annual production
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain · proposed total annual production
Link to this item- subject
- The Resort at Eagle Mountain
- role
- proposed total annual production
- value
- 123,090,203
- unit
- gallons
- time basis
- year
- allocation scope
- system
- aggregation warning
- Includes baseline and requested increment; do not add the increment again.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: proposed total annual production
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — N-2016-1392 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — N-2016-1392
- role
- listed production capacity
- value
- 23
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — N-2016-1393 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — N-2016-1393
- role
- listed production capacity
- value
- 37
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — N-2016-1390 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — N-2016-1390
- role
- listed production capacity
- value
- 91
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — N-2016-1391 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — N-2016-1391
- role
- listed production capacity
- value
- 50
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — N-2016-1484 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — N-2016-1484
- role
- listed production capacity
- value
- 150
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — N-2016-1483 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — N-2016-1483
- role
- listed production capacity
- value
- 50
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — proposed well 7 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — proposed well 7
- role
- listed production capacity
- value
- 79
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — proposed well 8 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — proposed well 8
- role
- listed production capacity
- value
- 60
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — proposed well 9 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — proposed well 9
- role
- listed production capacity
- value
- 99
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — proposed well 10 · listed production capacity
Link to this item- subject
- The Resort at Eagle Mountain — proposed well 10
- role
- listed production capacity
- value
- 60
- unit
- gallons
- time basis
- minute
- allocation scope
- well
- interpretation
- Capacity listing, not a separately granted annual allocation.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: listed production capacity
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort supplied measurements · reported static measurement shutdown interval
Link to this item- subject
- Resort supplied measurements
- role
- reported static measurement shutdown interval
- value
- 24
- unit
- hours
- time basis
- Unknown / not stated
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: reported static measurement shutdown interval
Source evidence · physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Paluxy wells under requested pumping · modeled additional drawdown
Link to this item- subject
- Paluxy wells under requested pumping
- role
- modeled additional drawdown
- value 1
- 20
- value 2
- 60
- unit
- feet
- time basis
- Unknown / not stated
- approximate
- true
- model
- true
- observed
- false
- allocation scope
- scenario, not allocation
- time basis note
- Simulation horizon not supplied
- interpretation
- Current model assumes unconfined Paluxy; range is projected, not observed.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: modeled additional drawdown
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Twin Mountains wells under requested pumping · modeled additional drawdown
Link to this item- subject
- Twin Mountains wells under requested pumping
- role
- modeled additional drawdown
- value 1
- 40
- value 2
- 95
- unit
- feet
- time basis
- Unknown / not stated
- approximate
- true
- model
- true
- observed
- false
- time basis note
- Simulation horizon not supplied
- interpretation
- Current model assumes confined Twin Mountains; confined/unconfined state uncertain.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: modeled additional drawdown
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort Wells 7/8 · number of wells authorized for drilling
Link to this item- subject
- Resort Wells 7/8
- role
- number of wells authorized for drilling
- value
- 2
- unit
- wells
- time basis
- Unknown / not stated
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: number of wells authorized for drilling
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort April drilling decision · additional production authorized by this motion
Link to this item- subject
- Resort April drilling decision
- role
- additional production authorized by this motion
- value
- 0
- unit
- gallons
- time basis
- year
- allocation scope
- increment only
- interpretation
- No additional production; NOT zero existing total annual authorization.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: additional production authorized by this motion
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Timarron · original reported estimated annual usage
Link to this item- subject
- Timarron
- role
- original reported estimated annual usage
- value
- 25,000,000
- unit
- gallons
- time basis
- year
- model
- false
- observed
- false
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: original reported estimated annual usage
Source evidence · physical p. 10
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Timarron · requested alternative authorized amount
Link to this item- subject
- Timarron
- role
- requested alternative authorized amount
- value
- 15,000,000
- unit
- gallons
- time basis
- year
- interpretation
- One proposed alternative, not approval.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: requested alternative authorized amount
Source evidence · physical p. 10
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Structured tables and transcriptions
Signs, units, nulls and ordered rows are retained. Notes distinguish printed source tables from structured transcriptions of prose or lists. Source evidence applies to each whole table; row links do not assert a more precise page location.
Table navigation · 6 transcriptions
Attendance as recorded
recorded attendance
Structured transcription of attendance list; repeated section rosters are not additional people. Names are not expanded from outside sources.
2026-04-08 · recorded meeting date. Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
Link to this table| Row link | Name | Role / attendance |
|---|---|---|
| 1 | President Konen | present |
| 2 | Secretary Merritt | present; named Wayne in discussion |
| 3 | Director Hamilton | present; named Chris in discussion |
| 4 | Vice President Cozart | absent |
| 5 | Director Haster | absent |
| 6 | Corey Jones | general manager |
| 7 | Hi Newby | staff |
| 8 | Laura Schumacher | staff |
| 9 | Jake Steen | district attorney, in person |
| 10 | John Ellis | Intera Inc., in person |
| 11 | Ty Embrey | district attorney, remote |
Table-level evidence for all rows below.
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford well system — application well schedule
application as listed
Structured transcription of source application blocks; local positions are not durable IDs.
2026-04-08 · recorded meeting date. Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
Link to this table| Row link | Local well position | Identifier as printed / null if absent | Listed capacity (GPM) | Aquifer as printed |
|---|---|---|---|---|
| 1 | 1 | N-2016-1113 | 800 | Twin Mountains |
| 2 | 2 | N-2018-0685 | 600 | Twin Mountains |
Table-level evidence for all rows below.
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek SMI — application well schedule
application as listed
Structured transcription of source application blocks; local positions are not durable IDs.
2026-04-08 · recorded meeting date. Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
Link to this table| Row link | Local well position | Identifier as printed / null if absent | Listed capacity (GPM) | Aquifer as printed |
|---|---|---|---|---|
| 1 | 1 | N-2026-0018 | 45 | Woodbine |
Table-level evidence for all rows below.
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — application well schedule
application as listed
Structured transcription of source application blocks; local positions are not durable IDs. Source-local Well 7 / New Well 1, Well 8 / New Well 2, Well 9 / New Well 3 and Well 10 / New Well 4 labels in earlier minutes; September labels 7–10. Absent durable identifiers remain null. Later identifier is not proof of permission to operate.
2026-04-08 · recorded meeting date. Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
Link to this table| Row link | Local well position | Identifier as printed / null if absent | Listed capacity (GPM) | Aquifer as printed |
|---|---|---|---|---|
| 1 | 1 | N-2016-1392 | 23 | Antlers |
| 2 | 2 | N-2016-1393 | 37 | Antlers |
| 3 | 3 | N-2016-1390 | 91 | Antlers |
| 4 | 4 | N-2016-1391 | 50 | Antlers |
| 5 | 5 | N-2016-1484 | 150 | Antlers |
| 6 | 6 | N-2016-1483 | 50 | Antlers |
| 7 | 7 | Not stated | 79 | Antlers |
| 8 | 8 | Not stated | 60 | Antlers |
| 9 | 9 | Not stated | 99 | Antlers |
| 10 | 10 | Not stated | 60 | Antlers |
Table-level evidence for all rows below.
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resort well locations as printed
application as listed
Structured source transcription. Signed coordinates and direction labels retained without geocoding; cross-document island/golf-course commentary relocated to the Resort matter.
2026-04-08 · recorded meeting date. Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
Link to this table| Row link | Source-local well number | Identifier | Latitude as printed (N) | Longitude as printed (negative with W label) | Context |
|---|---|---|---|---|---|
| 1 | 1 | N-2016-1392 | 32.955154 | -97.484893 | existing listed well |
| 2 | 2 | N-2016-1393 | 32.955154 | -97.484943 | existing listed well |
| 3 | 3 | N-2016-1390 | 32.953530 | -97.485063 | existing listed well |
| 4 | 4 | N-2016-1391 | 32.953494 | -97.485024 | existing listed well |
| 5 | 5 | N-2016-1484 | 32.950606 | -97.494942 | existing listed well |
| 6 | 6 | N-2016-1483 | 32.950608 | -97.494889 | existing listed well |
| 7 | 7 | Not stated | 32.9552231 | -97.4949366 | proposed/new well |
| 8 | 8 | Not stated | 32.9552236 | -97.4950159 | proposed/new well |
| 9 | 9 | Not stated | 32.944784 | -97.488661 | proposed/new well |
| 10 | 10 | Not stated | 32.944827 | -97.488698 | proposed/new well |
Table-level evidence for all rows below.
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Timarron alternatives
request
Structured transcription; alternatives not additive; current authorization and credit amount not stated.
2026-04-08 · recorded meeting date. Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
Link to this table| Row link | Option | Requested treatment | Requested annual gallons if stated |
|---|---|---|---|
| 1 | 1 | Increase authorization and credit difference from estimated usage | 15,000,000 |
| 2 | 2 | Retain current authorization and credit difference from estimated production | Not stated |
| 3 | 3 | Other compromise including credit | Not stated |
Table-level evidence for all rows below.
Source evidence · physical p. 10
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Wells, permits and water-domain objects
Everman well site
Link to this item- type
- well site
- label
- Everman well site
- location as printed
- 304 Southway Drive, Everman, Texas
- holder as named
- City of Everman
- context
- District acknowledged complaint jurisdiction over site within its boundaries.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford well system
Link to this item- type
- well system application
- label
- Bedford well system
- applicant as named
- City of Bedford
- location as printed
- Within CCN 10075
- well ids 1
- N-2016-1113
- well ids 2
- N-2018-0685
- aquifers 1
- Twin Mountains
- purpose
- PWS
- stage
- application as listed
- allocation scope
- system
- context
- Unknown / not stated
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: application as listed
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford well system — well 1
Link to this item- type
- well
- label
- Bedford well system — well 1
- identifier
- N-2016-1113
- applicant as named
- City of Bedford
- aquifer
- Twin Mountains
- capacity
- 800
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bedford well system — well 2
Link to this item- type
- well
- label
- Bedford well system — well 2
- identifier
- N-2018-0685
- applicant as named
- City of Bedford
- aquifer
- Twin Mountains
- capacity
- 600
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek SMI
Link to this item- type
- well system application
- label
- Lynn Creek SMI
- applicant as named
- Lynn Creek SMI, LLC
- location as printed
- 5700 Lake Ridge Parkway, Grand Prairie, Texas 75052
- well ids 1
- N-2026-0018
- aquifers 1
- Woodbine
- purpose
- Commercial Irrigation
- stage
- application as listed
- allocation scope
- well
- context
- Unknown / not stated
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: application as listed
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek SMI — well 1
Link to this item- type
- well
- label
- Lynn Creek SMI — well 1
- identifier
- N-2026-0018
- applicant as named
- Lynn Creek SMI, LLC
- aquifer
- Woodbine
- capacity
- 45
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain
Link to this item- type
- well system application
- label
- The Resort at Eagle Mountain
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- location as printed
- The Resort Blvd, Fort Worth, TX 76179
- well ids 1
- N-2016-1392
- well ids 2
- N-2016-1393
- well ids 3
- N-2016-1390
- well ids 4
- N-2016-1391
- well ids 5
- N-2016-1484
- well ids 6
- N-2016-1483
- well ids 7
- Unknown / not stated
- well ids 8
- Unknown / not stated
- well ids 9
- Unknown / not stated
- well ids 10
- Unknown / not stated
- aquifers 1
- Antlers
- purpose
- PWS
- stage
- application as listed
- allocation scope
- system
- context
- Source-local identifiers and nulls retained. Cross-document well-label commentary is available in the source-linked Resort matter.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: application as listed
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 1
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 1
- identifier
- N-2016-1392
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 23
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 2
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 2
- identifier
- N-2016-1393
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 37
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 3
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 3
- identifier
- N-2016-1390
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 91
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 4
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 4
- identifier
- N-2016-1391
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 50
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 5
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 5
- identifier
- N-2016-1484
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 150
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 6
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 6
- identifier
- N-2016-1483
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 50
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 7
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 7
- identifier
- Unknown / not stated
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 79
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 8
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 8
- identifier
- Unknown / not stated
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 60
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 9
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 9
- identifier
- Unknown / not stated
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 99
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
The Resort at Eagle Mountain — well 10
Link to this item- type
- well
- label
- The Resort at Eagle Mountain — well 10
- identifier
- Unknown / not stated
- applicant as named
- Aqua Texas, Inc. (Aqua Development, Inc.)
- aquifer
- Antlers
- capacity
- 60
- status at meeting
- as listed in application, not independently verified operation
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Future authorization to utilize wells 7/8
Link to this item- type
- permit condition
- label
- Future authorization to utilize wells 7/8
- well ids 1
- source-local Well 7
- well ids 2
- source-local Well 8
- condition
- If drilled, seek amendment at a subsequent hearing to utilize; proper notice/public hearing; approval not guaranteed and may be contested.
- status
- condition, no later fulfillment evidenced in this record
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Required 3D groundwater modeling
Link to this item- type
- permit condition
- label
- Required 3D groundwater modeling
- condition
- Perform 3D modeling to better characterize impacts/drawdowns associated with proposed wells and requested production for consideration of continued request.
- status
- requirement, not proof of completed/submitted model
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Unresolved questions
Bedford application is headed Grandfathered Use Permit but approving motion says Operating Permit. Quantity/vote are explicit; do not silently resolve permit-type inconsistency.
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
No supplied evidence here that wells were drilled, model fulfilled, or subsequent amendment approved. Requested production increase remains separate from limited drilling permission.
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Source attestation/signature is black-redacted; approval block says June 2, 2026.
Source evidence · physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Named entities and meeting-local relationships
Names remain as stated in each source. Similar names across meetings are not merged. Candidate relationships remain hypotheses.
Northern Trinity Groundwater Conservation District
Link to this item- name
- Northern Trinity Groundwater Conservation District
- type
- organization
- roles 1
- issuing district
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
President Konen
Link to this item- name
- President Konen
- type
- person
- roles 1
- present
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Secretary Merritt
Link to this item- name
- Secretary Merritt
- type
- person
- roles 1
- present; named Wayne in discussion
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Director Hamilton
Link to this item- name
- Director Hamilton
- type
- person
- roles 1
- present; named Chris in discussion
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Vice President Cozart
Link to this item- name
- Vice President Cozart
- type
- person
- roles 1
- absent
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Director Haster
Link to this item- name
- Director Haster
- type
- person
- roles 1
- absent
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Corey Jones
Link to this item- name
- Corey Jones
- type
- person
- roles 1
- general manager
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Hi Newby
Link to this item- name
- Hi Newby
- type
- person
- roles 1
- staff
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Laura Schumacher
Link to this item- name
- Laura Schumacher
- type
- person
- roles 1
- staff
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Jake Steen
Link to this item- name
- Jake Steen
- type
- person
- roles 1
- district attorney, in person
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
John Ellis
Link to this item- name
- John Ellis
- type
- person
- roles 1
- Intera Inc., in person
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Ty Embrey
Link to this item- name
- Ty Embrey
- type
- person
- roles 1
- district attorney, remote
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 5, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lloyd Gosselink, Rochelle & Townsend, P.C.
Link to this item- name
- Lloyd Gosselink, Rochelle & Townsend, P.C.
- type
- organization
- roles 1
- district legal counsel
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Intera Inc.
Link to this item- name
- Intera Inc.
- type
- organization
- roles 1
- technical consultant
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
C. Keith Helton
Link to this item- name
- C. Keith Helton
- type
- person
- roles 1
- complainant
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Craig Spencer
Link to this item- name
- Craig Spencer
- type
- person
- roles 1
- Everman city manager
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Greg Saunders
Link to this item- name
- Greg Saunders
- type
- person
- roles 1
- TNP Engineering
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Gilbert Ramirez
Link to this item- name
- Gilbert Ramirez
- type
- person
- roles 1
- Everman public works director
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
City of Everman
Link to this item- name
- City of Everman
- type
- organization
- roles 1
- complaint respondent
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 1, physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
TNP Engineering
Link to this item- name
- TNP Engineering
- type
- organization
- roles 1
- Everman engineer
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
City of Bedford
Link to this item- name
- City of Bedford
- type
- organization
- roles 1
- applicant
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Adrian Dias
Link to this item- name
- Adrian Dias
- type
- person
- roles 1
- Freese and Nichols; Bedford representative
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Freese and Nichols
Link to this item- name
- Freese and Nichols
- type
- organization
- roles 1
- Bedford consultant
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek SMI, LLC
Link to this item- name
- Lynn Creek SMI, LLC
- type
- organization
- roles 1
- applicant
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Aqua Texas, Inc. (Aqua Development, Inc.)
Link to this item- name
- Aqua Texas, Inc. (Aqua Development, Inc.)
- type
- organization
- roles 1
- applicant
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Matt Van Hattem
Link to this item- name
- Matt Van Hattem
- type
- person
- roles 1
- Aqua representative
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 7, physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Alyson McDonald
Link to this item- name
- Alyson McDonald
- type
- person
- roles 1
- Collier Consulting
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 7, physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Collier Consulting
Link to this item- name
- Collier Consulting
- type
- organization
- roles 1
- technical consultant
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Fort Worth Water
Link to this item- name
- Fort Worth Water
- type
- organization
- roles 1
- reported supply provider
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Texas Commission on Environmental Quality
Link to this item- name
- Texas Commission on Environmental Quality
- type
- organization
- roles 1
- referenced public-supply regulator
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Timarron Owners Association
Link to this item- name
- Timarron Owners Association
- type
- organization
- roles 1
- requesting association
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 10, physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Vonn Zauber
Link to this item- name
- Vonn Zauber
- type
- person
- roles 1
- Timarron representative
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 10
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
City of Euless Water Department
Link to this item- name
- City of Euless Water Department
- type
- organization
- roles 1
- outreach recipient
- identity scope
- source-local; no automatic cross-document identity merge
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-local; no automatic cross-document identity merge
Source evidence · physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
City of Bedford · applies_for
Link to this item- subject
- City of Bedford
- predicate
- applies for
- object
- pilot-ntgcd-aqua-resort-c89ef649d5bd-bedford
- identity scope
- explicit within this source
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: explicit within this source
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Lynn Creek SMI, LLC · applies_for
Link to this item- subject
- Lynn Creek SMI, LLC
- predicate
- applies for
- object
- pilot-ntgcd-aqua-resort-c89ef649d5bd-lynn
- identity scope
- explicit within this source
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: explicit within this source
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Aqua Texas, Inc. (Aqua Development, Inc.) · applies_for
Link to this item- subject
- Aqua Texas, Inc. (Aqua Development, Inc.)
- predicate
- applies for
- object
- pilot-ntgcd-aqua-resort-c89ef649d5bd-resort
- identity scope
- explicit within this source
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: explicit within this source
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Unavailable referenced material
Unavailable reference
Link to this item- description
- Lynn Creek well log not located according to GM; no log supplied.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Unavailable reference
Link to this item- description
- Underlying revised hydrogeologic report, submitted 24-hour levels, analytical/3D models and any executed drilling/permit instrument are not reproduced.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 7, physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Unavailable reference
Link to this item- description
- Official hearing audio, complaint documents, photographs/engineering rerouting plans, Timarron affidavit/meter data and budget/financial records are referenced but not reproduced.
- Date context
- Document context only: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
- Document / item context date
- 2026-04-08
- meeting
- 2026-04-08 — heading and recorded proceedings (physical p. 1)
- minutes approval
- 2026-06-02 — approval block, separately from meeting (physical p. 11)
Statement basis: source-linked item
Source evidence · physical p. 2, physical p. 3, physical p. 4, physical p. 10, physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
