2026 district research brief
Northern Trinity GCD — what the available 2026 records show
Board decisions, changes across records and questions the available minutes leave open.
- Included minutes
- – · 4 records
- Latest included minutes
- Prepared
- Corpus snapshot
Selected recorded minutes; not continuous coverage or a complete 2026 history.
Recorded overview: Viridian advanced from continuance to a conditional production approval; the Resort application remained continued in the June record. Other decisions addressed permit capacity, enforcement and office spending. These are distinct board actions, not evidence that proposed wells were built or conditions fulfilled. Jun 2, p. 3; Jul 29, p. 2; Jun 2, p. 3; Jul 29, p. 3; Jul 29, p. 6; Jul 29, p. 7
Board approved Viridian consolidation with monitoring conditions
Recorded: In February, requested information remained outstanding; in June, pump-test data had arrived but technical review was unfinished. On July 29 the board unanimously approved consolidation of Wells 4, 5 and proposed 6 at 336,050,000 gallons annually. The application combined existing Permits 50 and 51, proposed their cancellation, and sought 114,850,000 additional annual gallons for Well 6. Feb 12, p. 6; Jun 2, p. 3; Jul 29, p. 2; Jul 29, p. 2
Recorded: The approval requires a calibrated transducer in Well 6 when drilled, readings every 30 minutes with dates/times, periodic calibration checks and quarterly data submission. Geophysical logging must include spontaneous-potential, deep and shallow resistivity, and gamma logs. If water-level elevation falls to or below 30 feet above the aquifer top determined by the District from development logs, immediate notice is required; review may reduce Well 6 production. No completed drilling or triggered reduction is established. Jul 29, p. 2; Jul 29, p. 2; Jul 29, p. 2
Interpretation: For nearby well owners and permit researchers, the consequential change is approval tied to a measurable notification threshold. Later monitoring data would help assess fulfillment; the vote alone cannot. Jul 29, p. 2; Jul 29, p. 2; Jul 29, p. 2
A permit change can affect drilling, capacity or annual volume
Recorded: Aqua’s February Resort request sought four wells and 67,863,203 additional gallons annually, for a proposed 123,090,203 total. The board continued it for logs, static levels and a supply-phasing plan. April authorized drilling Wells 7/8 with no additional production; using them requires a later amendment hearing, and further consideration required 3D modeling. June reported model results not received and continued the application. The requested volume never became an approval in these cited dispositions. Feb 12, pp. 3–5; Feb 12, pp. 5–6; Apr 8, p. 8; Apr 8, p. 8; Jun 2, p. 3; Jun 2, p. 3
Recorded: July’s Cottonwood approvals concern Aqua’s separate system and Grandfathered Use Permit 118: an operating permit for the proposed Twin Mountains well and an amendment adding proposed Well 4, without increased annual authorization. Cottonwood is not Resort/Permit 115, and no additional production does not mean zero total authorization. Jul 29, p. 4; Jul 29, p. 4; Jul 29, p. 4; Jul 29, p. 5; Jun 2, p. 5
Recorded: In July the board approved amendments to DCLI’s permitted instantaneous Twin Mountains capacity: Permit 229 from 250 to 360 GPM, and Permit 228 separately from 250 to 360 GPM. Annual authorized volume was unchanged for each; Permit 228’s separate Paluxy limit remained 55 GPM. These votes do not establish physical alterations or measured pumping. Gallagher’s approved request instead added 140,000 gallons annually alongside Grandfathered Use Permit 179, for a combined 1,130,000 gallons. Jul 29, p. 3; Jul 29, p. 3; Jul 29, p. 3; Jul 29, p. 3; Jul 29, pp. 3–4; Jul 29, p. 4
Interpretation: Supply comparisons need both the annual allowance and the kind of authorization changed. Adding repeated application figures would misstate what the board granted. Feb 12, pp. 3–5; Apr 8, p. 8; Jul 29, p. 3; Jul 29, pp. 3–4
Enforcement dispositions varied by party and obligation
Recorded: After February discussion of Keith Helton’s complaint, April’s hearing recorded Everman’s denial of negligent or willful waste and staff/counsel’s contrary assessments. The board unanimously recorded a major violation with a $0 civil penalty, following discussion of corrective efforts. That is not a finding of no violation or proof that drainage repairs were completed. Feb 12, pp. 8–9; Apr 8, pp. 2–4; Apr 8, pp. 3–4; Apr 8, p. 5
Recorded: June separately assessed Aqua North Fork/Permit 114 a $1,000 civil penalty and $1,164.05 automatic excess-production penalty as a second major violation. Realty Income Properties 22/Permit 152 received a first-major-violation classification, a $500 civil-penalty waiver by 3–2 vote, and a $284.94 automatic penalty. Covenant Christian Academy’s $2,245.56 automatic penalty was reported paid; its $1,000 civil assessment had no equivalent payment statement. Resort/Permit 115’s potential violation was continued. Jun 2, p. 5; Jun 2, p. 6; Jun 2, p. 6; Jun 2, p. 5
Recorded: In July, staff reported Brawler Ventures/M5 Drilling Groundwater Availability Certification (GAC) well-location offsets of approximately 167 and 314 feet. The board combined the two wells into one major violation and assessed $500; payment is not supplied. Jul 29, p. 6; Jul 29, p. 6
Interpretation: A compliance researcher must distinguish classification, assessment, waiver and payment. These examples do not establish a districtwide waiver rule or an aggregate collectible balance. Apr 8, p. 5; Jun 2, p. 6; Jun 2, p. 6; Jul 29, p. 6
Dewatering and broader rules remained unfinished business
Recorded: February directed a letter to Fort Worth seeking a 30-day response on Village Creek dewatering costs, apparent violations and temporary-well status. By June an exception form had arrived, but registrations lacked required signatures; no action was taken. This does not establish an approved exception or completed registration. Feb 12, pp. 7–8; Feb 12, p. 8; Jun 2, p. 8
Recorded: July discussion covered temporary dewatering, system permits, subdivision/GAC wells, driller identification, penalty deadlines and hydrogeologic-study thresholds. No specific language was presented or adopted. Separately, June’s proposed desired-future-condition hearing left written comments open through 5 p.m. July 31, 2026; it recorded no adoption. Jul 29, p. 7; Jun 2, pp. 1–2
Interpretation: For drillers and developers, these are potential policy changes to track through actual rule text and adoption records, not new requirements established by this brief. Jul 29, p. 7; Jun 2, pp. 1–2
Office planning advanced to a spending ceiling
Recorded: June authorized continued evaluation of Resource Connection office space and costs. July authorized Option 1 reconfiguration, not to exceed $36,809.96, for approximately 1,772 square feet. The described lease proposed a January 1, 2027 start, an initial three years and renewal options for the following two years; the cited motion does not establish execution or payment. Jun 2, p. 8; Jul 29, p. 7; Jul 29, p. 7
Interpretation: This is a concrete administrative commitment with a ceiling, useful for later budget review; expenditure and occupancy require subsequent evidence. Jul 29, p. 7; Jul 29, p. 7
What remains unresolved
Proposed follow-up: Were Viridian’s conditions fulfilled, and was a later Resort production amendment granted?
Target: Written permit instruments, geophysical logs, quarterly monitoring submissions and later recorded permit hearings. Jul 29, p. 2; Jul 29, p. 2; Apr 8, p. 8; Jun 2, p. 3
Proposed follow-up: Were Village Creek registrations completed, assessed penalties paid, rules adopted or the office lease executed?
Target: Registration decisions, payment records, adopted rule text and executed lease/spending records. Jun 2, p. 8; Jul 29, p. 6; Jul 29, p. 7; Jul 29, p. 7
Coverage and method
Archive-selection window: January 1–September 28, 2026, by meeting date. This is the retained inventory’s search window, not complete coverage or the span of included minutes.
All four inventoried minutes were included: February 12, April 8, June 2 and July 29 (39 physical pages represented by the structured records). The synthesis covers substantive episodes, relevant permit/enforcement tables, conditions and recorded gaps, including the DCLI request/approval pairs. July’s approval block carries September 16 as the minutes-approval date; that is not a September meeting-outcome record. The retained archive inventory observed a September 16 agenda without linked September minutes. Its bounded listing cannot establish that every meeting was posted. Jul 29, pp. 8–9
Facts are paraphrases of published structured items, not quotations or independent technical/legal findings. Comparisons cite each side at the comparison. Interpretations describe possible research uses; follow-up targets are suggestions, not predictions that documents exist.
This is source-linked synthesis of the September 29, 2026 corpus snapshot, not an independent audit of original PDFs. No original pages were consulted for the briefs, and this website edition adds no official-source check. It does not establish current permit or compliance status.
Sources
Date/page citations use the recorded meeting date and physical PDF pages. Each link opens its exact structured item; repeated date/page labels can point to different items on the same page.
- February 12, 2026 — complete record; original; 10 physical pages.
- April 8, 2026 — complete record; original; 11 physical pages.
- June 2, 2026 — complete record; original; 9 physical pages.
- July 29, 2026 — complete record; original; 9 physical pages.
Deeper context: Northern Trinity GCD — Aqua Texas / The Resort at Eagle Mountain. The findings above cite underlying minutes, not the matter’s conclusions.
