Meeting intelligence · Historical management-plan submission packet with district notices, adoption resolution, reports and appended rules

Wes-Tex Groundwater Conservation District

Source meeting date

Date context: Primary plan hearing/adoption event is March4,2010. February23 was cancelled due to icy weather according to the March10 transmittal. March10 is submission/correspondence, not the hearing. Appended rules are2004. This is not approved minutes; approved_date is null; no subsequent TWDB approval letter is supplied.

The primary date identifies the recorded district hearing/adoption event used for routing. Historical reports, planning tables and appended rules retain their own dates and qualifications. Modeled and planning quantities are not pumping approvals. Current validity and newer meeting coverage remain unresolved.

Source-linked research summary. Verify important details against the official source record.

Meeting summary

Complete 83-page historical Wes-Tex GCD submission packet centered on the March 4,2010 management-plan hearing and signed adoption resolution. The earlier February 23 hearing was cancelled for icy weather; March 10 letters submit the plan for TWDB review and circulation. The plan covers Nolan County aquifers, modeled budgets, historical use and 2007 SWP supply/needs/strategies, including Champion Well Field, conservation and reuse. Appended rules were adopted August 26,2004 and effective August 31,2004. Storage, modeled recharge, forecast supply, historical pumping, rule thresholds and plan objectives remain separate; the source does not establish current rights, completed projects or later certification.

Source evidence · physical p. 1, physical p. 5, physical p. 6, physical p. 18, physical p. 19, physical p. 20, physical p. 27, physical p. 28, physical p. 33, physical p. 34, physical p. 35

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Source and dates

Meeting date · source stated
2010-03-04
Document approval date
Unknown / not stated
Routing metadata date
Unknown
Extraction date
2026-09-23
Last official source check
Unknown / no new source check performed
Source document
83 physical PDF pages · batch08-wes_tex_gcd-b733edc8f548
Source date roles and qualifications

2010-02-16 · notice posting and newspaper publication — For February23 hearing later cancelled.

Source evidence · physical p. 29, physical p. 32

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2010-02-23 · cancelled scheduled hearing — Cancellation due to icy weather reported in March10 cover letter.

Source evidence · physical p. 1, physical p. 29, physical p. 32

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2010-02-25 · notice receipt stamp — Faint stamp on replacement hearing notice; meeting date isMarch4.

Source evidence · physical p. 30

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2010-02-27 · publication — Article publication date; webpage last updatedMarch1 and printedMarch5.

Source evidence · physical p. 31

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2010-03-04 · hearing and plan adoption — Resolution records hearing and adoption; no vote count stated.

Source evidence · physical p. 28, physical p. 30

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2010-03-10 · submission and coordination correspondence — Cover and letters, not replacement meeting date.

Source evidence · physical p. 1, physical p. 33, physical p. 34

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2004-06-03 · appended rules proposal — Historical rules cover.

Source evidence · physical p. 35

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2004-08-26 · appended rules adoption — Historical rules cover and footers.

Source evidence · physical p. 35

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2004-08-31 · appended rules effective — Historical rules, not2010 adoption.

Source evidence · physical p. 35, physical p. 42

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2004-11-04 · earlier management plan adoption — Reported retrospectively in2010 plan.

Source evidence · physical p. 12

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2009-03-09 · historical dataset print — Printed on tables, not water-use observation year.

Source evidence · physical p. 17, physical p. 21, physical p. 24, physical p. 26

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Posting, filing, signature, approval, study and referenced dates retain their own roles. They do not automatically conflict with the meeting date.

PDF page fragments are navigation hints; some viewers may open at the beginning.

Source identity: sha256:b733edc8f54866f1d321b91a2896939759ebe1afb2ec141ca68b69d816c20a66

Source completeness

All physical pages read using supplied text/OCR, with visual inspection of maps, tables, scanned notices, signatures, correspondence and ambiguous spans. Source limitations are disclosed; no independent reviewer verification is established.

Explore Entities and timelines · Dated mentions, without assumed identity merges.

Quantities, roles and time bases · 1526 values

Quantities, roles and time bases

Requested, recommended, historic, modeled and approved values retain their separate roles. A null time basis does not remove a time dimension already present in the unit.

G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2010 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2010
role
projected surface supply
value
118
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 1; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
1
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2020 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2020
role
projected surface supply
value
118
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 1; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
1
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2030 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2030
role
projected surface supply
value
116
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 1; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
1
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2040 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2040
role
projected surface supply
value
112
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 1; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
1
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2050 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2050
role
projected surface supply
value
106
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 1; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
1
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2060 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Brazos | Brazos River Run-of-River | 2060
role
projected surface supply
value
101
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 1; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
1
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2010 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2010
role
projected surface supply
value
10
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 2; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
2
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2020 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2020
role
projected surface supply
value
9
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 2; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
2
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2030 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2030
role
projected surface supply
value
11
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 2; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
2
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2040 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2040
role
projected surface supply
value
14
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 2; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
2
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2050 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2050
role
projected surface supply
value
19
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 2; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
2
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2060 · projected surface supply

Link to this item
subject
G | Bitter Creek WSC | Nolan | Colorado | Brazos River Run-of-River | 2060
role
projected surface supply
value
24
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 2; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
2
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2010 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2010
role
projected surface supply
value
71
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 3; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
3
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2020 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2020
role
projected surface supply
value
71
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 3; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
3
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2030 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2030
role
projected surface supply
value
72
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 3; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
3
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2040 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2040
role
projected surface supply
value
74
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 3; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
3
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2050 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2050
role
projected surface supply
value
78
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 3; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
3
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2060 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Brazos | Brazos River Run-of-River | 2060
role
projected surface supply
value
82
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 3; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
3
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2010 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2010
role
projected surface supply
value
97
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 4; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
4
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2020 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2020
role
projected surface supply
value
96
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 4; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
4
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2030 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2030
role
projected surface supply
value
94
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 4; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
4
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2040 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2040
role
projected surface supply
value
91
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 4; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
4
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2050 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2050
role
projected surface supply
value
86
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 4; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
4
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2060 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Brazos River Run-of-River | 2060
role
projected surface supply
value
82
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 4; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
4
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2010 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2010
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 5; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
5
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2020 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2020
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 5; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
5
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2030 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2030
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 5; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
5
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2040 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2040
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 5; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
5
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2050 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2050
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 5; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
5
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2060 · projected surface supply

Link to this item
subject
G | County Other | Nolan | Colorado | Oak Creek Lake/Reservoir | 2060
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 5; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
5
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2010 · projected surface supply

Link to this item
subject
G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2010
role
projected surface supply
value
120
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 6; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
6
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2020 · projected surface supply

Link to this item
subject
G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2020
role
projected surface supply
value
120
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 6; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
6
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2030 · projected surface supply

Link to this item
subject
G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2030
role
projected surface supply
value
120
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 6; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
6
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2040 · projected surface supply

Link to this item
subject
G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2040
role
projected surface supply
value
120
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 6; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
6
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2050 · projected surface supply

Link to this item
subject
G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2050
role
projected surface supply
value
120
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 6; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
6
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2060 · projected surface supply

Link to this item
subject
G | Irrigation | Nolan | Brazos | Brazos River Combined Run-of-River Irrigation | 2060
role
projected surface supply
value
120
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 6; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
6
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Brazos | Livestock Local Supply | 2010 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Brazos | Livestock Local Supply | 2010
role
projected surface supply
value
223
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 7; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
7
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Brazos | Livestock Local Supply | 2020 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Brazos | Livestock Local Supply | 2020
role
projected surface supply
value
223
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 7; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
7
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Brazos | Livestock Local Supply | 2030 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Brazos | Livestock Local Supply | 2030
role
projected surface supply
value
223
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 7; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
7
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Brazos | Livestock Local Supply | 2040 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Brazos | Livestock Local Supply | 2040
role
projected surface supply
value
223
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 7; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
7
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Brazos | Livestock Local Supply | 2050 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Brazos | Livestock Local Supply | 2050
role
projected surface supply
value
223
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 7; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
7
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Brazos | Livestock Local Supply | 2060 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Brazos | Livestock Local Supply | 2060
role
projected surface supply
value
223
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 7; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
7
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Colorado | Livestock Local Supply | 2010 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Colorado | Livestock Local Supply | 2010
role
projected surface supply
value
241
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 8; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
8
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Colorado | Livestock Local Supply | 2020 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Colorado | Livestock Local Supply | 2020
role
projected surface supply
value
241
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 8; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
8
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Colorado | Livestock Local Supply | 2030 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Colorado | Livestock Local Supply | 2030
role
projected surface supply
value
241
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 8; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
8
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Colorado | Livestock Local Supply | 2040 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Colorado | Livestock Local Supply | 2040
role
projected surface supply
value
241
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 8; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
8
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Colorado | Livestock Local Supply | 2050 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Colorado | Livestock Local Supply | 2050
role
projected surface supply
value
241
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 8; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
8
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Livestock | Nolan | Colorado | Livestock Local Supply | 2060 · projected surface supply

Link to this item
subject
G | Livestock | Nolan | Colorado | Livestock Local Supply | 2060
role
projected surface supply
value
241
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 8; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
8
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2010 · projected surface supply

Link to this item
subject
G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2010
role
projected surface supply
value
305
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 9; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
9
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2020 · projected surface supply

Link to this item
subject
G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2020
role
projected surface supply
value
303
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 9; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
9
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2030 · projected surface supply

Link to this item
subject
G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2030
role
projected surface supply
value
302
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 9; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
9
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2040 · projected surface supply

Link to this item
subject
G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2040
role
projected surface supply
value
300
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 9; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
9
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2050 · projected surface supply

Link to this item
subject
G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2050
role
projected surface supply
value
298
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 9; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
9
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2060 · projected surface supply

Link to this item
subject
G | Manufacturing | Nolan | Brazos | Sweetwater Lake/Reservoir | 2060
role
projected surface supply
value
297
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 9; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
9
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2010 · projected surface supply

Link to this item
subject
G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2010
role
projected surface supply
value
443
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 10; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
10
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2020 · projected surface supply

Link to this item
subject
G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2020
role
projected surface supply
value
441
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 10; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
10
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2030 · projected surface supply

Link to this item
subject
G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2030
role
projected surface supply
value
439
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 10; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
10
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2040 · projected surface supply

Link to this item
subject
G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2040
role
projected surface supply
value
436
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 10; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
10
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2050 · projected surface supply

Link to this item
subject
G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2050
role
projected surface supply
value
434
unit
acre-feet/year
time basis
2050
allocation scope
Table1: 2007 SWP projected surface supplies; row 10; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
10
table column
2050
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2060 · projected surface supply

Link to this item
subject
G | Steam Electric Power | Nolan | Brazos | Sweetwater Lake/Reservoir | 2060
role
projected surface supply
value
432
unit
acre-feet/year
time basis
2060
allocation scope
Table1: 2007 SWP projected surface supplies; row 10; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
10
table column
2060
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Sweetwater | Nolan | Brazos | Oak Creek Lake/Reservoir | 2010 · projected surface supply

Link to this item
subject
G | Sweetwater | Nolan | Brazos | Oak Creek Lake/Reservoir | 2010
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2010
allocation scope
Table1: 2007 SWP projected surface supplies; row 11; 2010
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
11
table column
2010
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2010
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Sweetwater | Nolan | Brazos | Oak Creek Lake/Reservoir | 2020 · projected surface supply

Link to this item
subject
G | Sweetwater | Nolan | Brazos | Oak Creek Lake/Reservoir | 2020
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2020
allocation scope
Table1: 2007 SWP projected surface supplies; row 11; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
11
table column
2020
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Sweetwater | Nolan | Brazos | Oak Creek Lake/Reservoir | 2030 · projected surface supply

Link to this item
subject
G | Sweetwater | Nolan | Brazos | Oak Creek Lake/Reservoir | 2030
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2030
allocation scope
Table1: 2007 SWP projected surface supplies; row 11; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
11
table column
2030
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

G | Sweetwater | Nolan | Brazos | Oak Creek Lake/Reservoir | 2040 · projected surface supply

Link to this item
subject
G | Sweetwater | Nolan | Brazos | Oak Creek Lake/Reservoir | 2040
role
projected surface supply
value
0
unit
acre-feet/year
time basis
2040
allocation scope
Table1: 2007 SWP projected surface supplies; row 11; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-wes_tex_gcd-b733edc8f548-tables-001
table row
11
table column
2040
qualifier
Historical 2007 SWP, database print March9,2009. Zeros are printed; not proof of current water rights.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2009-03-09
historical dataset print
2009-03-09 — Printed on tables, not water-use observation year. (physical p. 17)

Statement basis: projected surface supply

Source evidence · physical p. 17

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.