Meeting intelligence · Historical management-plan submission packet with district notices, adoption resolution, reports and appended rules
Duval County Groundwater Conservation District
Source meeting date
Date context: Primary district hearing/plan-adoption event is June28,2023, independently documented by signed resolution and certification. June16 is notice/filing/publication context. Older reports/rules retain their own dates. This is not meeting minutes; approved_date is null, and subsequent TWDB certification is not supplied.
The primary date identifies the recorded district hearing/adoption event used for routing. Historical reports, planning tables and appended rules retain their own dates and qualifications. Modeled and planning quantities are not pumping approvals. Current validity and newer meeting coverage remain unresolved.
Source-linked research summary. Verify important details against the official source record.
Meeting summary
Complete 171-page historical Duval County GCD management-plan submission packet. The district scheduled a June 28,2023 hearing and separately adopted its plan by Resolution 2023-1 with 5 ayes and 0 nays; effectiveness was conditioned on TWDB certification. The packet retains the 2022 GMA 16 modeled-availability report,2016 historical water-budget study,2022 water-use/planning dataset,2016 rules with selected 2018 amendments, publication/posting evidence and June 28 coordination letters. Modeled availability and planning strategies are not individual pumping approvals, and plan objectives do not prove later performance. Source arithmetic/wording discrepancies and scan/handwriting limits remain disclosed.
Source evidence · physical p. 20, physical p. 36, physical p. 49, physical p. 57, physical p. 158, physical p. 161, physical p. 162, physical p. 165
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Source and dates
- Meeting date · source stated
- 2023-06-28
- Document approval date
- Unknown / not stated
- Routing metadata date
- Unknown
- Extraction date
- 2026-09-23
- Last official source check
- Unknown / no new source check performed
- Source document
- 171 physical PDF pages · batch08-duval_county_gcd-cb767e176181
Source date roles and qualifications
2023-06-28 · hearing and plan adoption — District resolution records adoption; notice alone is prospective.
Source evidence · physical p. 158, physical p. 161, physical p. 162
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2023-06-16 · notice filing and publication — Notice date and filed stamp; newspaper caption publication date, not the hearing.
Source evidence · physical p. 158, physical p. 159
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2023-06-28 · coordination correspondence — Letters request surface-water entity contact list to finish coordination.
Source evidence · physical p. 165, physical p. 166, physical p. 167, physical p. 168, physical p. 169, physical p. 170, physical p. 171
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2022-10-31 · model report — GAM21-021MAG publication, not a2023 observation.
Source evidence · physical p. 20, physical p. 22
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2022-06-28 · GMA16 DFC readoption — Minor clerical corrections after2021 adoption; a different body/event.
Source evidence · physical p. 22, physical p. 23
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2021-11-23 · GMA16 DFC adoption — Historical joint-planning context.
Source evidence · physical p. 22
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2022-08-26 · DFC materials administrative completeness — Not certification of2023 Duval plan.
Source evidence · physical p. 22
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2016-10-21 · historical model report — GAM16-011; budget periods1981–1999/1980–1997.
Source evidence · physical p. 36, physical p. 39
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2022-06-27 · water dataset report — Historical use and2022SWP data compilation.
Source evidence · physical p. 49, physical p. 51, physical p. 54
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2016-10-25 · rules adoption — Appended rules identify this adoption/effective date.
Source evidence · physical p. 57, physical p. 61
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2018-02-28 · selected rule amendments — Revision table identifies Rule2,3.5,3.6,3.7,8.9.
Source evidence · physical p. 56, physical p. 57
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Posting, filing, signature, approval, study and referenced dates retain their own roles. They do not automatically conflict with the meeting date.
PDF page fragments are navigation hints; some viewers may open at the beginning.
Source identity: sha256:cb767e17618123fefcc643d606fc6ed0c2ccc49e33c231bc913426c527e7f243
Source completeness
All physical pages read using supplied text/OCR, with visual inspection of maps, tables, scanned notices, signatures, correspondence and ambiguous spans. Source limitations are disclosed; no independent reviewer verification is established.
Explore Entities and timelines · Dated mentions, without assumed identity merges.
Matters, observations and decisions
Requests, recommendations and approvals retain their recorded labels. A passed motion is a procedural result; conditions are requirements, not proof of fulfillment. Repeated quantities are not added together.
District creation and geographic scope
historical background
Link to this item- topic
- District creation and geographic scope
- stage
- historical background
- statement
- The plan reports creation by Senate Bill 1847 inMay 2005, confirmation election July 25,2009, five directors with four-year terms, and boundaries covering Duval County. It locates the district in GMA 16 and RegionN.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- No single item event date supplied
Source evidence · physical p. 3
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
County setting and population
historical background
Link to this item- topic
- County setting and population
- stage
- historical background
- statement
- County area is 1,795 square miles and elevation 250–800 feet;2020 population is 9,831. The population chart provides historical trend context but not a numerical label for every plotted point.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- No single item event date supplied
Source evidence · physical p. 4, physical p. 5
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Aquifer architecture and quality
reported hydrogeologic background
Link to this item- topic
- Aquifer architecture and quality
- stage
- reported hydrogeologic background
- statement
- Gulf Coast is the primary aquifer system: Chicot, Evangeline, Burkeville Confining Unit and Jasper. Yegua-Jackson underlies much of Duval and has limited northwestern outcrop use. Potential brackish/desalination use and suspected poorer quality beneath Gulf Coast units are prospects/qualifications, not approved projects or sample-specific findings.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- No single item event date supplied
Source evidence · physical p. 5, physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
DFC and MAG planning context
adopted planning target
Link to this item- topic
- DFC and MAG planning context
- stage
- adopted planning target
- statement
- Plan reports GMA 16 average drawdown not exceeding 78 feet atDecember 2080 and Duval 137 feet overJanuary 2010–December 2079. These are desired/model contexts, not observed declines. Duval modeled availability increases from 20,571 acre-feet/year in 2020 to 26,963 from 2060 through 2080 in the attached table.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
- GMA16 DFC readoption
- 2022-06-28 — Minor clerical corrections after2021 adoption; a different body/event. (physical p. 23)
Source evidence · physical p. 8, physical p. 23, physical p. 29
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
New model not yet adopted in plan narrative
reported pending model update
Link to this item- topic
- New model not yet adopted in plan narrative
- stage
- reported pending model update
- statement
- Plan says a new regional GMA 15/16 model had been released for public comment, and the district was awaiting adoption/new TWDB runs while using the existing 2016 water-budget study. No later model adoption is established here.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
Source evidence · physical p. 8
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Supply needs and strategies
planning projection
Link to this item- topic
- Supply needs and strategies
- stage
- planning projection
- statement
- The 2022 SWP dataset identifies County-Other, mining and San Diego MUD 1 needs, with no printed irrigation needs. Listed strategies include additional Gulf Coast supply and conservation; these are planning values, not individual permits or evidence of construction.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2022-06-27
- water dataset report
- 2022-06-27 — Historical use and2022SWP data compilation. (physical p. 54)
Source evidence · physical p. 9, physical p. 52, physical p. 53, physical p. 54
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Plan effectiveness and review
conditional plan requirement
Link to this item- topic
- Plan effectiveness and review
- stage
- conditional plan requirement
- statement
- Plan calls for board adoption and TWDB certification of administrative completeness, review at least every five years, and revision as needed. Resolution 2023-1 conditions effectiveness on TWDB certification and says revised certified plan or five years, whichever earlier. Certification and current validity are not established by this packet.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
- hearing and plan adoption
- 2023-06-28 — District resolution records adoption; notice alone is prospective. (physical p. 161)
Source evidence · physical p. 10, physical p. 161
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Efficient use and waste prevention
adopted plan objective
Link to this item- topic
- Efficient use and waste prevention
- stage
- adopted plan objective
- statement
- Register wells and permit non-exempt operation; report new registrations and investigated violations; distribute annual efficiency and waste information; annually review waste rules and inform drillers. These are performance commitments, not proof that all wells were registered or violations found.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
Source evidence · physical p. 11, physical p. 12
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Subsidence vulnerability
reported study context
Link to this item- topic
- Subsidence vulnerability
- stage
- reported study context
- statement
- Plan cites LRE Water/Furans 2017 susceptibility work indicating moderately high vulnerability especially in western Duval. This is susceptibility assessment, not observed subsidence. Plan calls for investigating reports and board reporting.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
Source evidence · physical p. 12
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Conjunctive planning and salinity monitoring
adopted plan objective
Link to this item- topic
- Conjunctive planning and salinity monitoring
- stage
- adopted plan objective
- statement
- Objective calls for attending at least 50 percent of RegionL andN meetings, while the performance standard calls for at least one RegionN meeting annually. Plan also calls for annual salinity tests on irrigated crop/pasture fields and salinity/nitrate sampling of at least one new well each year.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
Source evidence · physical p. 13
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Quality, water-level and drought monitoring
adopted plan objective
Link to this item- topic
- Quality, water-level and drought monitoring
- stage
- adopted plan objective
- statement
- Annual well-testing day, review of injection/land-treatment information and TWDB levels, at least one new well-level measurement annually, and monthly Palmer drought-index review are specified. District monitoring since 2013 is reported; no individual well IDs or results are supplied here.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
Source evidence · physical p. 14
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Conservation and recharge priorities
adopted plan objective
Link to this item- topic
- Conservation and recharge priorities
- stage
- adopted plan objective
- statement
- Annual conservation information/rule review and rainwater-harvesting outreach are proposed standards. Recharge enhancement is deemed inapplicable because no known cost-effective opportunities are identified. No precipitation-enhancement activity is planned; annual brush-management field-day participation is an objective.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
Source evidence · physical p. 15, physical p. 16
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
DFC monitoring and accountability
adopted plan objective
Link to this item- topic
- DFC monitoring and accountability
- stage
- adopted plan objective
- statement
- Annual water levels, five-year drawdown/pumping review, collection of pumping reports by October of the following year and an annual self-analysis report by January are specified. Review compares to DFCs; it is not a finding that DFCs have been achieved.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
Source evidence · physical p. 16, physical p. 17
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
GMA 16 DFC procedural history
reported joint planning sequence
Link to this item- topic
- GMA 16 DFC procedural history
- stage
- reported joint planning sequence
- statement
- Ki Cha report states DFC adoption November 23,2021, readoption June 28,2022 for clerical corrections, and TWDB administrative completeness August 26,2022. Steve C. Young supplied January 22 material; TWDB sought June 2 clarification because some wording was unachievable; amended explanatory report submitted July 4. Carrizo-Wilcox and Yegua-Jackson were declared non-relevant for joint planning, not absent aquifers.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2022-10-31
- model report
- 2022-10-31 — GAM21-021MAG publication, not a2023 observation. (physical p. 20)
- model report
- 2022-10-31 — GAM21-021MAG publication, not a2023 observation. (physical p. 22)
- GMA16 DFC readoption
- 2022-06-28 — Minor clerical corrections after2021 adoption; a different body/event. (physical p. 22)
- GMA16 DFC readoption
- 2022-06-28 — Minor clerical corrections after2021 adoption; a different body/event. (physical p. 23)
- GMA16 DFC adoption
- 2021-11-23 — Historical joint-planning context. (physical p. 22)
- DFC materials administrative completeness
- 2022-08-26 — Not certification of2023 Duval plan. (physical p. 22)
Source evidence · physical p. 20, physical p. 22, physical p. 23
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Predictive model method
modeled scenario
Link to this item- topic
- Predictive model method
- stage
- modeled scenario
- statement
- Alternative GMA 16 modelv 1.01 uses Pumping Scenario 2. Drawdown is extracted between January 2010 stress 11 and December 2079 stress 81, evaluated with three-foot tolerance. ZONEBUDGET 3.01 extracts decade pumping. MODFLOW 2000, six layers and May 1,2014 entity grid are described; Gulf Coast layers 1–4 are combined.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2022-10-31
Source evidence · physical p. 24, physical p. 27
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Dry-cell pumping qualification
model limitation
Link to this item- topic
- Dry-cell pumping qualification
- stage
- model limitation
- statement
- The confined-layer implementation continues pumping even from cells with water levels below their bottoms. Dry-cell pumping and drawdown were retained, though physically unrealistic conditions may result. Regional modeled availability is not assurance of local recoverability or site-specific yield.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2022-10-31
Source evidence · physical p. 28, physical p. 33
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Historical modeled budgets
historical model report
Link to this item- topic
- Historical modeled budgets
- stage
- historical model report
- statement
- Rohit R. Goswami GAM 16-011 replaces GAM 11-001 and uses central Gulf Coastv 1.01 for 1981–1999 and Yegua-Jacksonv 1.01 for 1980–1997 annual-average budgets. The 2017 adoption/submission/expiration dates concern an earlier plan cycle, not the 2023 adoption.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2016-10-21
- historical model report
- 2016-10-21 — GAM16-011; budget periods1981–1999/1980–1997. (physical p. 36)
- historical model report
- 2016-10-21 — GAM16-011; budget periods1981–1999/1980–1997. (physical p. 39)
Source evidence · physical p. 36, physical p. 38, physical p. 39
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Water-budget assumptions and boundaries
model limitation
Link to this item- topic
- Water-budget assumptions and boundaries
- stage
- model limitation
- statement
- Gulf Coast uses four layers/MODFLOW 96 with partially penetrating Evangeline wells because deep properties lack data; Yegua-Jackson uses five layers/MODFLOW 2000. Model-cell centroid assignment approximates district boundaries. Regional historical calibration and climate limit local or future interpretation.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2016-10-21
Source evidence · physical p. 40, physical p. 41, physical p. 43, physical p. 45, physical p. 46
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Dataset scope
historical dataset and projection
Link to this item- topic
- Dataset scope
- stage
- historical dataset and projection
- statement
- TWDB report dated June 27,2022 supplies historical water use 2004–2019 and 2022 SWP forecasts 2020–2070;2020 historical estimates were unavailable. Demands include plumbing-code savings; data may be revised and district discrepancies should be reported.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2022-06-27
- water dataset report
- 2022-06-27 — Historical use and2022SWP data compilation. (physical p. 49)
- water dataset report
- 2022-06-27 — Historical use and2022SWP data compilation. (physical p. 51)
Source evidence · physical p. 49, physical p. 50, physical p. 51, physical p. 52
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
June 28 agenda
scheduled items
Link to this item- topic
- June 28 agenda
- stage
- scheduled items
- statement
- June 16 notice schedules June 28,2023 at 6 p.m. in Benavides: Joel Pigg/Texas Well Owner Network May water-quality screening report; plan hearing and possible adoption; June 2 minutes; Ernest Garza CPA May 31 finances; bills; Pat A. Rogers Jr. financial-interest disclosure; next meeting. Only plan adoption is separately documented as an outcome. Public-comment limits are 3 minutes, or 6 with translator.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
- hearing and plan adoption
- 2023-06-28 — District resolution records adoption; notice alone is prospective. (physical p. 158)
- notice filing and publication
- 2023-06-16 — Notice date and filed stamp; newspaper caption publication date, not the hearing. (physical p. 158)
Source evidence · physical p. 158
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Publication and posting
publication evidence
Link to this item- topic
- Publication and posting
- stage
- publication evidence
- statement
- The packet reproduces The Enterprise hearing notice with June 16,2023 caption and a district-office posting photograph. Adjacent music reporting and RegionM nominations are newspaper context, not Duval board actions. The photo documents displayed notices without enabling a precise transcription of every small/reflected line.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-16
- notice filing and publication
- 2023-06-16 — Notice date and filed stamp; newspaper caption publication date, not the hearing. (physical p. 159)
Source evidence · physical p. 159, physical p. 160
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Plan adoption
recorded board decision
Link to this item- topic
- Plan adoption
- stage
- recorded board decision
- statement
- Signed Resolution 2023-1 adopts the plan dated June 28,2023. Printed signatories are Roberto Garcia, President, and Pat Rodgers, Vice-President. Vote entries are 5 ayes,0 nays. Handwritten motion names are retained as uncertain readings rather than resolved identities. Effectiveness depends on TWDB certification.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
- hearing and plan adoption
- 2023-06-28 — District resolution records adoption; notice alone is prospective. (physical p. 161)
Source evidence · physical p. 161
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Resolution certification
signed certification
Link to this item- topic
- Resolution certification
- stage
- signed certification
- statement
- Jorge Gonzalez, General Manager, certifies the foregoing action occurred at a duly noticed June 28 meeting. Sworn June 28,2023 before notary Melissa Flores Almaraz. This district certification is not a TWDB administrative-completeness approval.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
- hearing and plan adoption
- 2023-06-28 — District resolution records adoption; notice alone is prospective. (physical p. 162)
Source evidence · physical p. 162
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Coordination still being completed
correspondence request
Link to this item- topic
- Coordination still being completed
- stage
- correspondence request
- statement
- June 28 letters announce adoption and request a list of surface-water entities needed to complete coordination and submit the packet for TWDB review/approval. Recipients are Travis Pruski (Nueces River Authority/RegionN), Jeff Walker, Robert Bradley, Peggy G. Hunka, Stephen Allen and Scott Bledsoe III. No response or subsequent completion is provided. Letterhead George Gonzales and signature caption Jorge Gonzalez are preserved as variants.
- Date context
- Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity.
- Document / item context date
- 2023-06-28
- coordination correspondence
- 2023-06-28 — Letters request surface-water entity contact list to finish coordination. (physical p. 165)
- coordination correspondence
- 2023-06-28 — Letters request surface-water entity contact list to finish coordination. (physical p. 166)
- coordination correspondence
- 2023-06-28 — Letters request surface-water entity contact list to finish coordination. (physical p. 167)
- coordination correspondence
- 2023-06-28 — Letters request surface-water entity contact list to finish coordination. (physical p. 168)
- coordination correspondence
- 2023-06-28 — Letters request surface-water entity contact list to finish coordination. (physical p. 169)
- coordination correspondence
- 2023-06-28 — Letters request surface-water entity contact list to finish coordination. (physical p. 170)
- coordination correspondence
- 2023-06-28 — Letters request surface-water entity contact list to finish coordination. (physical p. 171)
Source evidence · physical p. 165, physical p. 166, physical p. 167, physical p. 168, physical p. 169, physical p. 170, physical p. 171
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Appended historical rule: 1.1 Authority to Promulgate Rules
historical rule text
Link to this item- topic
- Appended historical rule: 1.1 Authority to Promulgate Rules
- stage
- historical rule text
- statement
- 1.1 Authority to Promulgate Rules A. The Duval County Groundwater Conservation District is a political subdivision of the State of Texas. The District was created by the 79th Legislature 2005 by Senate Bill 1847, subject to voter approval. Senate Bill 1847 gives the District all of the rights, powers, privileges, authority, functions and duties provided under the general law of this state, including Texas Water Code Chapter 36, applicable to Groundwater Conservation Districts created under Section 59, Article XVI, of the Texas Constitution. The District’s Enabling Legislation has been codified in Texas Special District Law Code, chapter 8808. B. In a confirmation election held on July 25, 2009, District voters confirmed the creation of the District and elected five Directors to the Board of Directors. As a duly created and confirmed Groundwater Conservation District, the District may exercise any and all statutory authority or power conferred under its Enabling Legislation and under Chapter 36 of the Texas Water Code, including the adoption and Enforcement of Rules under Section 36.101 Rule Making Power. All references to statutory provisions in these Rules are to those provisions as may be amended from time to time. C. The District is located within Groundwater Management Area 16. The District is located in the Coastal Bend Regional Water Planning Area (N). Adopted October 25, 2016, by Board Order; effective October 25, 2016.
- date status
- Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- source text qualification
- Transcribed from supplied PDF text/OCR with whitespace normalized. Not a certified verbatim legal edition; minor OCR spelling artifacts may remain. Physical source page controls. Threshold highlights and tables were separately checked; no claim that rule conditions were fulfilled.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity. Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- Document / item context date
- No single item event date supplied
- rules adoption
- 2016-10-25 — Appended rules identify this adoption/effective date. (physical p. 61)
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 61)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 61)
Source evidence · physical p. 61
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Appended historical rule: 1.2 District Boundaries
historical rule text
Link to this item- topic
- Appended historical rule: 1.2 District Boundaries
- stage
- historical rule text
- statement
- 1.2 District Boundaries The District includes all territory located within Duval County. Adopted October 25, 2016, by Board Order; effective October 25, 2016.
- date status
- Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- source text qualification
- Transcribed from supplied PDF text/OCR with whitespace normalized. Not a certified verbatim legal edition; minor OCR spelling artifacts may remain. Physical source page controls. Threshold highlights and tables were separately checked; no claim that rule conditions were fulfilled.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity. Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- Document / item context date
- No single item event date supplied
- rules adoption
- 2016-10-25 — Appended rules identify this adoption/effective date. (physical p. 61)
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 61)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 61)
Source evidence · physical p. 61
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Appended historical rule: 1.3 Purpose of the Rules
historical rule text
Link to this item- topic
- Appended historical rule: 1.3 Purpose of the Rules
- stage
- historical rule text
- statement
- 1.3 Purpose of the Rules A. The District Rules are promulgated under its Enabling Legislation and the Texas Water Code Chapter 36 authority to make and enforce Rules to provide for the Conservation, preservation, protection, and Recharge of Groundwater and aquifers within the District, in order to control subsidence, prevent degradation of water quality, and to prevent Waste, while recognizing the ownership and rights of the owners of the land and their lessees and assigns in Groundwater. Consistent with Texas Water Code section 36.0015, the District through these Rules will manage Groundwater in a manner that protects property rights, balances the Conservation and development of Groundwater to meet the needs of this state, and uses the Best Available Science in the Conservation and development of Groundwater. B. The District recognizes that a Landowner owns the Groundwater below the surface of his land as real property and has any other right recognized under common law. This entitles the Landowner, his lessees, heirs, or assigns, to drill for and produce the Groundwater without causing Waste or malicious drainage of other property or negligently causing subsidence, but it does not give them the right to capture a specific Volume of Groundwater and does not affect any defenses to liability under the rule of capture. C. While the District does not have the authority to deprive or divest a Landowner, his lessees, heirs, or assigns of the Groundwater ownership and rights described in Rule 1.3.B, the District does have the authority to adopt and enforce Rules: (1) to limit or prohibit the drilling of a Well if the location does not comply with minimum spacing or tract size requirements adopted by the District; (2) to regulate Groundwater production as authorized under Texas Water Code Chapter 36 or a special law governing the District; and (3) to allocate to each Landowner a proportionate share of available Groundwater for production from an aquifer based on the number of acres owned. D. These Rules, and any orders, requirements, resolutions, policies, directives, standards, guidelines, Groundwater Management Plan, or other regulatory measures implemented by the Board, have been promulgated to fulfill these objectives. These Rules may not be construed to limit, restrict, or deprive the District or Board of any exercise of any power, duty, or jurisdiction conferred by the District’s Enabling Legislation, Texas Water Code Chapter 36, or any other applicable law or statute. Adopted October 25, 2016, by Board Order; effective October 25, 2016.
- date status
- Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- source text qualification
- Transcribed from supplied PDF text/OCR with whitespace normalized. Not a certified verbatim legal edition; minor OCR spelling artifacts may remain. Physical source page controls. Threshold highlights and tables were separately checked; no claim that rule conditions were fulfilled.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity. Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- Document / item context date
- No single item event date supplied
- rules adoption
- 2016-10-25 — Appended rules identify this adoption/effective date. (physical p. 61)
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 61)
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 62)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 61)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 62)
Source evidence · physical p. 61, physical p. 62
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Appended historical rule: 1.4 Effective Date
historical rule text
Link to this item- topic
- Appended historical rule: 1.4 Effective Date
- stage
- historical rule text
- statement
- 1.4 Effective Date These Rules and any amendment are effective on the effective dates indicated following each subsection. Adopted October 25, 2016, by Board Order; effective October 25, 2016.
- date status
- Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- source text qualification
- Transcribed from supplied PDF text/OCR with whitespace normalized. Not a certified verbatim legal edition; minor OCR spelling artifacts may remain. Physical source page controls. Threshold highlights and tables were separately checked; no claim that rule conditions were fulfilled.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity. Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- Document / item context date
- No single item event date supplied
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 62)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 62)
Source evidence · physical p. 62
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Appended historical rule: 1.5 Action on Rules
historical rule text
Link to this item- topic
- Appended historical rule: 1.5 Action on Rules
- stage
- historical rule text
- statement
- 1.5 Action on Rules A. The Board may from time to time, following notice and Public Hearing, amend or revoke these Rules or adopt new Rules following the procedures of Rule 8.2. B. The Board may adopt an Emergency Rule without prior notice or hearing, or with an abbreviated notice and hearing, according to Rule 8.3. C. In adopting, amending, or revoking a rule, the District must: (1) consider all Groundwater needs and uses; (2) develop Rules that are fair and impartial; (3) consider the Groundwater ownership rights described in Texas Water Code 36.002 and District Rule 1.3.B; (4) consistent with the objectives of Section 59, Article XVI of the Texas Constitution, consider the public interest in Conservation, preservation, protection, recharging and prevention of Waste of Groundwater; and controlling subsidence; (5) consider the goals of the District’s Management Plan; and (6) not discriminate between land that is irrigated for production and land that was irrigated for production and enrolled or participating in a federal Conservation program. (7) protect property rights, balance the Conservation and development of groundwater to meet the needs of this state, and use the best available science in the Conservation and development of groundwater. Adopted October 25, 2016, by Board Order; effective October 25, 2016.
- date status
- Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- source text qualification
- Transcribed from supplied PDF text/OCR with whitespace normalized. Not a certified verbatim legal edition; minor OCR spelling artifacts may remain. Physical source page controls. Threshold highlights and tables were separately checked; no claim that rule conditions were fulfilled.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity. Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- Document / item context date
- No single item event date supplied
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 63)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 63)
Source evidence · physical p. 63
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Appended historical rule: 1.6 Regulatory Compliance
historical rule text
Link to this item- topic
- Appended historical rule: 1.6 Regulatory Compliance
- stage
- historical rule text
- statement
- 1.6 Regulatory Compliance All Wells located within the District, Owners and Operators of those Wells, and others under the jurisdiction of the District, shall be in compliance with all applicable Rules, orders, regulations, requirements, resolutions, policies, directives, standards, guidelines, or any other regulatory measures implemented by the District. Adopted October 25, 2016, by Board Order; effective October 25, 2016.
- date status
- Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- source text qualification
- Transcribed from supplied PDF text/OCR with whitespace normalized. Not a certified verbatim legal edition; minor OCR spelling artifacts may remain. Physical source page controls. Threshold highlights and tables were separately checked; no claim that rule conditions were fulfilled.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity. Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- Document / item context date
- No single item event date supplied
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 63)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 63)
Source evidence · physical p. 63
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Appended historical rule: 1.7 Variances
historical rule text
Link to this item- topic
- Appended historical rule: 1.7 Variances
- stage
- historical rule text
- statement
- 1.7 Variances A. Any exceptions or Variances to the requirements imposed by District Rules shall be considered on a case-by-case basis. A request for Variance shall be submitted in writing and include the reasons for the request. B. This Rule 1.7 is not applicable to a request for a Variance from an Operating Permit requirement. A Variance from any requirements contained in an Operating Permit requires an Application for an Amendment pursuant to Rule 3.9. C. A request for a Variance from the Spacing requirements of Rule 10 must comply with Rule 10.6. Adopted October 25, 2016, by Board Order; effective October 25, 2016.
- date status
- Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- source text qualification
- Transcribed from supplied PDF text/OCR with whitespace normalized. Not a certified verbatim legal edition; minor OCR spelling artifacts may remain. Physical source page controls. Threshold highlights and tables were separately checked; no claim that rule conditions were fulfilled.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity. Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- Document / item context date
- No single item event date supplied
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 64)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 64)
Source evidence · physical p. 64
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Appended historical rule: 1.8 Administrative Fees
historical rule text
Link to this item- topic
- Appended historical rule: 1.8 Administrative Fees
- stage
- historical rule text
- statement
- 1.8 Administrative Fees Texas Water Code Section 36.205 authorizes the District to assess Fees for administrative acts of the District. Such Fees shall not unreasonably exceed the cost to the District of providing the administrative function for which the Fee is charged. Fees shall be assessed in accordance with the District Fee Schedule set by the Board. If the Board adopts a Fee Schedule, a copy will be available at the District Office and on the District website. Adopted October 25, 2016, by Board Order; effective October 25, 2016.
- date status
- Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- source text qualification
- Transcribed from supplied PDF text/OCR with whitespace normalized. Not a certified verbatim legal edition; minor OCR spelling artifacts may remain. Physical source page controls. Threshold highlights and tables were separately checked; no claim that rule conditions were fulfilled.
- Date context
- Historical submission packet: no single supported item date; the primary adoption date is not inherited. Models, planning values and historical rules are not pumping approvals or evidence of current validity. Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text.
- Document / item context date
- No single item event date supplied
- historical rule set context
- 2016-10-25 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 64)
- historical rule set context
- 2018-02-28 — Rule-set adoption2016-10-25 and selected amendments2018-02-28; individual adoption/amendment statements retained in text. (physical p. 64)
Source evidence · physical p. 64
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
