Meeting intelligence · Historical management-plan submission packet with district notices, adoption resolution, reports and appended rules

Duval County Groundwater Conservation District

Source meeting date

Date context: Primary district hearing/plan-adoption event is June28,2023, independently documented by signed resolution and certification. June16 is notice/filing/publication context. Older reports/rules retain their own dates. This is not meeting minutes; approved_date is null, and subsequent TWDB certification is not supplied.

The primary date identifies the recorded district hearing/adoption event used for routing. Historical reports, planning tables and appended rules retain their own dates and qualifications. Modeled and planning quantities are not pumping approvals. Current validity and newer meeting coverage remain unresolved.

Source-linked research summary. Verify important details against the official source record.

Meeting summary

Complete 171-page historical Duval County GCD management-plan submission packet. The district scheduled a June 28,2023 hearing and separately adopted its plan by Resolution 2023-1 with 5 ayes and 0 nays; effectiveness was conditioned on TWDB certification. The packet retains the 2022 GMA 16 modeled-availability report,2016 historical water-budget study,2022 water-use/planning dataset,2016 rules with selected 2018 amendments, publication/posting evidence and June 28 coordination letters. Modeled availability and planning strategies are not individual pumping approvals, and plan objectives do not prove later performance. Source arithmetic/wording discrepancies and scan/handwriting limits remain disclosed.

Source evidence · physical p. 20, physical p. 36, physical p. 49, physical p. 57, physical p. 158, physical p. 161, physical p. 162, physical p. 165

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Source and dates

Meeting date · source stated
2023-06-28
Document approval date
Unknown / not stated
Routing metadata date
Unknown
Extraction date
2026-09-23
Last official source check
Unknown / no new source check performed
Source document
171 physical PDF pages · batch08-duval_county_gcd-cb767e176181
Source date roles and qualifications

2023-06-28 · hearing and plan adoption — District resolution records adoption; notice alone is prospective.

Source evidence · physical p. 158, physical p. 161, physical p. 162

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2023-06-16 · notice filing and publication — Notice date and filed stamp; newspaper caption publication date, not the hearing.

Source evidence · physical p. 158, physical p. 159

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2023-06-28 · coordination correspondence — Letters request surface-water entity contact list to finish coordination.

Source evidence · physical p. 165, physical p. 166, physical p. 167, physical p. 168, physical p. 169, physical p. 170, physical p. 171

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2022-10-31 · model report — GAM21-021MAG publication, not a2023 observation.

Source evidence · physical p. 20, physical p. 22

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2022-06-28 · GMA16 DFC readoption — Minor clerical corrections after2021 adoption; a different body/event.

Source evidence · physical p. 22, physical p. 23

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2021-11-23 · GMA16 DFC adoption — Historical joint-planning context.

Source evidence · physical p. 22

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2022-08-26 · DFC materials administrative completeness — Not certification of2023 Duval plan.

Source evidence · physical p. 22

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2016-10-21 · historical model report — GAM16-011; budget periods1981–1999/1980–1997.

Source evidence · physical p. 36, physical p. 39

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2022-06-27 · water dataset report — Historical use and2022SWP data compilation.

Source evidence · physical p. 49, physical p. 51, physical p. 54

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2016-10-25 · rules adoption — Appended rules identify this adoption/effective date.

Source evidence · physical p. 57, physical p. 61

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2018-02-28 · selected rule amendments — Revision table identifies Rule2,3.5,3.6,3.7,8.9.

Source evidence · physical p. 56, physical p. 57

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Posting, filing, signature, approval, study and referenced dates retain their own roles. They do not automatically conflict with the meeting date.

PDF page fragments are navigation hints; some viewers may open at the beginning.

Source identity: sha256:cb767e17618123fefcc643d606fc6ed0c2ccc49e33c231bc913426c527e7f243

Source completeness

All physical pages read using supplied text/OCR, with visual inspection of maps, tables, scanned notices, signatures, correspondence and ambiguous spans. Source limitations are disclosed; no independent reviewer verification is established.

Explore Entities and timelines · Dated mentions, without assumed identity merges.

Quantities, roles and time bases · 936 values

Quantities, roles and time bases

Requested, recommended, historic, modeled and approved values retain their separate roles. A null time basis does not remove a time dimension already present in the unit.

N | San Diego MUD 1 | Nueces-Rio Grande | 2070 · projected need or surplus

Link to this item
subject
N | San Diego MUD 1 | Nueces-Rio Grande | 2070
role
projected need or surplus
value
-417
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected supply needs; row 11; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-009
table row
11
table column
2070
qualifier
June27,2022 dataset. Printed units acre-feet. Negative=need, positive=surplus. Zero is printed; not missing.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected need or surplus

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Sum | 2020 · projected need or surplus

Link to this item
subject
Sum | 2020
role
projected need or surplus
value
-1,477
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected supply needs; row 12; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-009
table row
12
table column
2020
qualifier
June27,2022 dataset. Printed units acre-feet. Negative=need, positive=surplus. Zero is printed; not missing.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected need or surplus

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Sum | 2030 · projected need or surplus

Link to this item
subject
Sum | 2030
role
projected need or surplus
value
-1,567
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected supply needs; row 12; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-009
table row
12
table column
2030
qualifier
June27,2022 dataset. Printed units acre-feet. Negative=need, positive=surplus. Zero is printed; not missing.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected need or surplus

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Sum | 2040 · projected need or surplus

Link to this item
subject
Sum | 2040
role
projected need or surplus
value
-1,504
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected supply needs; row 12; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-009
table row
12
table column
2040
qualifier
June27,2022 dataset. Printed units acre-feet. Negative=need, positive=surplus. Zero is printed; not missing.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected need or surplus

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Sum | 2050 · projected need or surplus

Link to this item
subject
Sum | 2050
role
projected need or surplus
value
-1,427
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected supply needs; row 12; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-009
table row
12
table column
2050
qualifier
June27,2022 dataset. Printed units acre-feet. Negative=need, positive=surplus. Zero is printed; not missing.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected need or surplus

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Sum | 2060 · projected need or surplus

Link to this item
subject
Sum | 2060
role
projected need or surplus
value
-1,389
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected supply needs; row 12; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-009
table row
12
table column
2060
qualifier
June27,2022 dataset. Printed units acre-feet. Negative=need, positive=surplus. Zero is printed; not missing.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected need or surplus

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Sum | 2070 · projected need or surplus

Link to this item
subject
Sum | 2070
role
projected need or surplus
value
-1,361
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected supply needs; row 12; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-009
table row
12
table column
2070
qualifier
June27,2022 dataset. Printed units acre-feet. Negative=need, positive=surplus. Zero is printed; not missing.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected need or surplus

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2020 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2020
role
projected strategy supply
value
42
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 1; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
1
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2030 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2030
role
projected strategy supply
value
40
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 1; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
1
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2040 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2040
role
projected strategy supply
value
42
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 1; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
1
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2050 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2050
role
projected strategy supply
value
42
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 1; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
1
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2060 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2060
role
projected strategy supply
value
42
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 1; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
1
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2070 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2070
role
projected strategy supply
value
42
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 1; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
1
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Printed subtotal | 2020 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Printed subtotal | 2020
role
projected strategy supply
value
42
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 2; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
2
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Printed subtotal | 2030 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Printed subtotal | 2030
role
projected strategy supply
value
40
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 2; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
2
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Printed subtotal | 2040 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Printed subtotal | 2040
role
projected strategy supply
value
42
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 2; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
2
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Printed subtotal | 2050 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Printed subtotal | 2050
role
projected strategy supply
value
42
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 2; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
2
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Printed subtotal | 2060 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Printed subtotal | 2060
role
projected strategy supply
value
42
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 2; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
2
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces (N) | Printed subtotal | 2070 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces (N) | Printed subtotal | 2070
role
projected strategy supply
value
42
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 2; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
2
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2020 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2020
role
projected strategy supply
value
474
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 3; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
3
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2030 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2030
role
projected strategy supply
value
474
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 3; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
3
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2040 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2040
role
projected strategy supply
value
474
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 3; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
3
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2050 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2050
role
projected strategy supply
value
474
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 3; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
3
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2060 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2060
role
projected strategy supply
value
474
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 3; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
3
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2070 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval County Other System | Gulf Coast Aquifer [Duval] | 2070
role
projected strategy supply
value
474
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 3; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
3
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2020 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2020
role
projected strategy supply
value
474
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 4; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
4
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2030 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2030
role
projected strategy supply
value
474
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 4; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
4
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2040 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2040
role
projected strategy supply
value
474
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 4; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
4
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2050 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2050
role
projected strategy supply
value
474
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 4; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
4
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2060 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2060
role
projected strategy supply
value
474
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 4; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
4
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2070 · projected strategy supply

Link to this item
subject
County-Other, Duval, Nueces-Rio Grande (N) | Printed subtotal | 2070
role
projected strategy supply
value
474
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 4; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
4
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2020 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2020
role
projected strategy supply
value
0
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 5; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
5
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2030 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2030
role
projected strategy supply
value
54
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 5; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
5
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2040 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2040
role
projected strategy supply
value
110
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 5; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
5
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2050 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2050
role
projected strategy supply
value
170
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 5; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
5
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2060 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2060
role
projected strategy supply
value
211
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 5; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
5
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2070 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Municipal Conservation - Freer WCID | DEMAND REDUCTION [Duval] | 2070
role
projected strategy supply
value
215
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 5; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
5
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Printed subtotal | 2020 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Printed subtotal | 2020
role
projected strategy supply
value
0
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 6; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
6
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Printed subtotal | 2030 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Printed subtotal | 2030
role
projected strategy supply
value
54
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 6; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
6
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Printed subtotal | 2040 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Printed subtotal | 2040
role
projected strategy supply
value
110
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 6; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
6
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Printed subtotal | 2050 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Printed subtotal | 2050
role
projected strategy supply
value
170
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 6; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
6
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Printed subtotal | 2060 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Printed subtotal | 2060
role
projected strategy supply
value
211
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 6; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
6
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Freer WCID, Nueces (N) | Printed subtotal | 2070 · projected strategy supply

Link to this item
subject
Freer WCID, Nueces (N) | Printed subtotal | 2070
role
projected strategy supply
value
215
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 6; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
6
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2020 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2020
role
projected strategy supply
value
102
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 7; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
7
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2030 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2030
role
projected strategy supply
value
102
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 7; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
7
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2040 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2040
role
projected strategy supply
value
102
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 7; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
7
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2050 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2050
role
projected strategy supply
value
102
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 7; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
7
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2060 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2060
role
projected strategy supply
value
102
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 7; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
7
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2070 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2070
role
projected strategy supply
value
102
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 7; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
7
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2020 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2020
role
projected strategy supply
value
3
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 8; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
8
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2030 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2030
role
projected strategy supply
value
6
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 8; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
8
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2040 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2040
role
projected strategy supply
value
9
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 8; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
8
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2050 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2050
role
projected strategy supply
value
11
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 8; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
8
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2060 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2060
role
projected strategy supply
value
13
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 8; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
8
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2070 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Mining Water Conservation | DEMAND REDUCTION [Duval] | 2070
role
projected strategy supply
value
15
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 8; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
8
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Printed subtotal | 2020 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Printed subtotal | 2020
role
projected strategy supply
value
105
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 9; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
9
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Printed subtotal | 2030 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Printed subtotal | 2030
role
projected strategy supply
value
108
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 9; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
9
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Printed subtotal | 2040 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Printed subtotal | 2040
role
projected strategy supply
value
111
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 9; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
9
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Printed subtotal | 2050 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Printed subtotal | 2050
role
projected strategy supply
value
113
unit
acre-feet
time basis
2050
allocation scope
2022 SWP projected management strategies; row 9; 2050
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
9
table column
2050
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2050
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Printed subtotal | 2060 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Printed subtotal | 2060
role
projected strategy supply
value
115
unit
acre-feet
time basis
2060
allocation scope
2022 SWP projected management strategies; row 9; 2060
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
9
table column
2060
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2060
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces (N) | Printed subtotal | 2070 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces (N) | Printed subtotal | 2070
role
projected strategy supply
value
117
unit
acre-feet
time basis
2070
allocation scope
2022 SWP projected management strategies; row 9; 2070
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
9
table column
2070
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2070
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2020 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2020
role
projected strategy supply
value
666
unit
acre-feet
time basis
2020
allocation scope
2022 SWP projected management strategies; row 10; 2020
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
10
table column
2020
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2020
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2030 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2030
role
projected strategy supply
value
666
unit
acre-feet
time basis
2030
allocation scope
2022 SWP projected management strategies; row 10; 2030
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
10
table column
2030
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2030
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Mining, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2040 · projected strategy supply

Link to this item
subject
Mining, Duval, Nueces-Rio Grande (N) | Gulf Coast Supplies - Duval Mining System | Gulf Coast Aquifer [Duval] | 2040
role
projected strategy supply
value
666
unit
acre-feet
time basis
2040
allocation scope
2022 SWP projected management strategies; row 10; 2040
aggregation warning
Source table transcription. Totals, repeated representations and different periods are not additional independent allocations; do not sum indiscriminately.
table id
batch08-duval_county_gcd-cb767e176181-tables-010
table row
10
table column
2040
qualifier
Printed units acre-feet. Group headings carried into rows; unlabelled bold numeric rows are identified as printed subtotals. Mining Nueces-Rio Grande group continues onto p54. Not constructed capacity or permits; subtotals are not additional supply.
Date context
Historical submission packet: the supplied section date qualifies this item only. Models, planning values and historical rules are not pumping approvals or evidence of current validity. 2040
Document / item context date
2022-06-27

Statement basis: projected strategy supply

Source evidence · physical p. 53

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.