Meeting intelligence · Minutes
Northern Trinity Groundwater Conservation District
Source meeting date
Date context: Dates qualify the meeting/scheduled event and minutes approval separately; acquisition is not an event date.
Source-linked research summary. Verify important details against the official source record.
Meeting summary
The board approved 33 grandfathered-use applications in three categories, including The Resort at Eagle Mountain; requested and approved amounts differ for several systems. It approved a Dolese operating permit, addressed overproduction cases, accepted Samantha Springs settlement revisions and authorized website redesign spending.
Source evidence · physical p. 2, physical p. 3, physical p. 4, physical p. 5, physical p. 6, physical p. 14, physical p. 16, physical p. 17, physical p. 18
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Source and dates
- Meeting date · source stated
- 2024-03-26
- Document approval date
- 2024-06-26
- Routing metadata date
- Unknown
- Extraction date
- 2026-09-24T23:34:07.537256+00:00
- Last official source check
- 2026-09-24T21:01:49.133373+00:00
- Source document
- 19 physical PDF pages · pilot-ntgcd-aqua-resort-06baaa6c1fca
Source date roles and qualifications
2024-03-26 · meeting — heading and recorded proceedings
Source evidence · physical p. 1
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2024-06-26 · minutes approval — approval block, separately from meeting
Source evidence · physical p. 19
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Posting, filing, signature, approval, study and referenced dates retain their own roles. They do not automatically conflict with the meeting date.
PDF page fragments are navigation hints; some viewers may open at the beginning.
Source identity: sha256:06baaa6c1fca64d8416c5f7cb83317a094a311985700ca6514bf5eb25efcc418
Source completeness
All physical pages visually read. Supplied black signature redactions cannot be recovered. Pale text and ambiguous printed values are qualified in unresolved entries; no independent reviewer verification claimed.
- source acquired at
- 2026-09-24T21:01:49.133373+00:00
- source checked at
- 2026-09-24T21:01:49.133373+00:00
- source check basis
- carried unchanged from supplied acquisition manifest; no new source availability check
Explore Entities and timelines · Dated mentions, without assumed identity merges.
Matters, observations and decisions
Requests, recommendations and approvals retain their recorded labels. A passed motion is a procedural result; conditions are requirements, not proof of fulfillment. Repeated quantities are not added together.
Meeting sequence
recorded procedure
Link to this item- topic
- Meeting sequence
- stage
- recorded procedure
- statement
- Quorum established at 2:00 PM. Grandfathered-use hearing ended and operating hearing began at 2:54 PM; operating hearing ended and regular meeting began at 2:58 PM; meeting adjourned 3:46 PM.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 1, physical p. 14, physical p. 15, physical p. 19
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Grandfathered-use categories
staff recommendation
Link to this item- topic
- Grandfathered-use categories
- stage
- staff recommendation
- statement
- 33 applications: Category 1 (20) recommended as filed, Category 2 (6) recommended below requests at maximum grandfathered use, and Category 3 (7) needing discussion. The stated grandfathered period is 2014–2018.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 2, physical p. 3
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Category 1 applications including Resort
board approval
Link to this item- topic
- Category 1 applications including Resort
- stage
- board approval
- statement
- Cozart moved to approve the first twenty applications as presented; Gladbach seconded; unanimous. The GM verified registration, reporting and fee-payment currency for these applicants. This source records the historical approval, not present permit validity.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 2, physical p. 3, physical p. 4
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Category 2 applications
board approval
Link to this item- topic
- Category 2 applications
- stage
- board approval
- statement
- Cozart moved to accept the GM recommendation for all six; Merritt seconded; unanimous. Gateway cited expansion/irrigation demand and Aqua representatives population growth. GM said future additional usage would require an operating-permit application and stated an additional hydrogeological study would not be required to increase production; this is the discussion in this source, not a general present rule.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 3, physical p. 4
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Ladera partial-year applications
board approval
Link to this item- topic
- Ladera partial-year applications
- stage
- board approval
- statement
- GM cited Rule 1.1(z) partial-year usage; representative reported wells out of service and difficulty obtaining service. Cozart moved to approve GM recommendations for N-2018-0212/0213/0214; Gladbach seconded; unanimous.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 5
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Dolese grandfathered-use applications
board approval
Link to this item- topic
- Dolese grandfathered-use applications
- stage
- board approval
- statement
- Rule 1.1(z) assumed annual usage eligibility discussed for N-2018-0111/0112. Cozart moved to approve GM recommendations; Gladbach seconded; unanimous.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 5, physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Marshall Ridge
board approval
Link to this item- topic
- Marshall Ridge
- stage
- board approval
- statement
- GM said reports were unavailable for the grandfathered period and recommended the 2023 reported amount of 11,455,200 gallons. Cozart moved to approve 11,500,000 gallons/year for N-2022-0282; Gladbach seconded; unanimous. Irrigation only; requested 15,000,000 appears separately on p.13.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Prairie Ridge
board approval
Link to this item- topic
- Prairie Ridge
- stage
- board approval
- statement
- GM recommended 16,000,000 for four wells eligible under Rule 1.1(z) assumed usage. Cozart moved approval; Laughlin seconded; unanimous.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Dolese operating permit
board approval
Link to this item- topic
- Dolese operating permit
- stage
- board approval
- statement
- GM described a previously approved/drilled well tested at 17 GPM, eligible for capacity exemption, with proposed increase to 38 GPM meeting spacing. Laughlin moved approval for 4,580,000 gpy and 38 GPM; Cozart seconded; unanimous. No public comment.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 14
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Consent agenda
board approval
Link to this item- topic
- Consent agenda
- stage
- board approval
- statement
- Cozart moved approval; Gladbach seconded; unanimous. Included November 29, 2023 minutes, budget performance/investment statements, invoices and staff reimbursement. Nothing pulled; no public comment.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 15
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Southlake permits 13, 14, 15
board enforcement decision
Link to this item- topic
- Southlake permits 13, 14, 15
- stage
- board enforcement decision
- statement
- City representative attributed extra watering to cracked athletic fields during dry conditions. Cozart moved, Laughlin seconded; unanimous violations with three-times/ten-times applicable water-use fees and condition permits be amended to reflect real-time usage. Board suggested operating permits to avoid further violations. Described second-violation civil penalty is $1,000 for 13 and 15; motion records applicable violations/fee multipliers rather than a calculated total.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 16
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
QTS permit 76
board enforcement decision
Link to this item- topic
- QTS permit 76
- stage
- board enforcement decision
- statement
- Cozart moved three-times excess water-use fee; Gladbach seconded; unanimous. Minutes report the three-times overpumping penalty already paid.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 16, physical p. 17
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Fidelity permit 77
board enforcement decision
Link to this item- topic
- Fidelity permit 77
- stage
- board enforcement decision
- statement
- Representative attributed pumping to raising a pond for dredging. Board instructed notice to district when overpumping circumstances arise. Cozart moved three-times excess fee; Gladbach seconded; unanimous; minutes report payment already made.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 17
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
TM Watercress 26 and Vines 6
board enforcement decision
Link to this item- topic
- TM Watercress 26 and Vines 6
- stage
- board enforcement decision
- statement
- Vines is described as managed by the same company as Permit 26. Laughlin moved three-times excess fee for both; Cozart seconded; unanimous. No name for that management company is supplied.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 17
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Samantha Springs / Joe McCombs
board approval
Link to this item- topic
- Samantha Springs / Joe McCombs
- stage
- board approval
- statement
- Embrey reported an executed settlement version was being emailed and requested signature; prior November 29, 2023 board authorization to sign was recalled. Cozart moved acceptance of administrative revisions to well names/water-quality component; Gladbach seconded; unanimous. Agreement described two springhouses, eight boreholes: three domestic, two already plugged, one more to plug, two district monitoring wells. Springhouses cannot be modified; no evidence here of later plugging fulfillment.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 18
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2023 water-quality testing
report
Link to this item- topic
- 2023 water-quality testing
- stage
- report
- statement
- Hi Newby presented 2023 water-quality results for five Tarrant County wells; measurements and report not reproduced.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 18
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Website redesign
board approval
Link to this item- topic
- Website redesign
- stage
- board approval
- statement
- Cozart moved to accept the $12,000 estimated redesign cost; Laughlin seconded; unanimous. Existing site described as designed in 2016; public water-conservation education encouraged.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 18
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
GM / board reports
report no action
Link to this item- topic
- GM / board reports
- stage
- report no action
- statement
- GMA 8 model update, newsletter, Texas Water Leaders Program, monitor-well update and new office space listed; no board action on reports or next-meeting item.
- date status
- recorded meeting date; embedded historical/future dates retain their stated roles
- Date context
- Supported date of this section only; not a resolution of the whole-document date.
- Supported section date
- 2024-03-26
Source evidence · physical p. 19
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
