Meeting intelligence · Minutes and attachments

North Plains Groundwater Conservation District

Source meeting date

Date context: Signed June16 minutes; separate minutes approval date not shown. Embedded contracts/report/production dates are separately scoped.

Source-linked research summary. Verify important details against the official source record.

Meeting summary

The June minutes record district administration, consultant approvals, 2025 reporting and well approvals, four separately unresolved BLF compliance categories, other parties’ meter/plugging issues, and no motion after the cross-referenced closed session. The Walthour agreement identifies a Hartley County state case without providing court instruments. Complete attachments include EKI terms and rates and Sloane’s qualified 2025 agricultural demonstration results.

Source evidence · physical p. 2, physical p. 3, physical p. 9, physical p. 10, physical p. 11, physical p. 15, physical p. 32

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Source and dates

Meeting date · source stated
2026-06-16
Document approval date
Unknown / not stated
Routing metadata date
Unknown
Extraction date
2026-09-28T00:31:27.720849+00:00
Last official source check
Unknown / no new source check performed
Source document
93 physical PDF pages · north-plains-watch01-4181603978d4
Source date roles and qualifications

2026-06-16 · recorded meeting date — Whole minutes date, not inherited by every attachment.

Source evidence · physical p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Exact date not stated · minutes approval date — Signed block gives no separate approvaldate.

Source evidence · physical p. 12

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026-06-16 · contract execution date — Handwritten16June2026.

Source evidence · physical p. 22

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026-10-01 · contract effective date — Explicitly regardless of execution.

Source evidence · physical p. 2, physical p. 18, physical p. 22

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2028-09-30 · contract term end — Subject to30daytermination.

Source evidence · physical p. 2, physical p. 18

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026-05-11 · agreement date — Not June board date.

Source evidence · physical p. 23, physical p. 28

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026-06-11 · work authorization signature date — Handwritten district date.

Source evidence · physical p. 30

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026-06-18 · work authorization signature date — Printed EKI date.

Source evidence · physical p. 30

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026-01-04 · rate schedule date — Incorporated charge schedule.

Source evidence · physical p. 31

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026-06 · report month — Day unavailable; reportingperiod2025.

Source evidence · physical p. 32

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2025-12-30 · production report submission date — StatusSubmitted, not approval.

Source evidence · physical p. 93

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026-07-20 · scheduled meeting date — Text says June meeting but names July20; no subsequent completion inferred.

Source evidence · physical p. 12

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Posting, filing, signature, approval, study and referenced dates retain their own roles. They do not automatically conflict with the meeting date.

PDF page fragments are navigation hints; some viewers may open at the beginning.

Source identity: sha256:4181603978d4bb58c99ab5559225fa25c6f474126aa74cee4dded340034e51b3

Source completeness

93 of93physicalpages, allattachments

issuer
North Plains Groundwater Conservation District
source publisher
North Plains Groundwater Conservation District
District role
issuing district
source acquired at
Unknown / not stated
source checked at
Unknown / not stated
source check basis
Individual acquisition/check timestamp unavailable in supplied manifest; run ID retained only as linkage.

Explore Entities and timelines · Dated mentions, without assumed identity merges.

Matters, observations and decisions

Requests, recommendations and approvals retain their recorded labels. A passed motion is a procedural result; conditions are requirements, not proof of fulfillment. Repeated quantities are not added together.

Opening and attendance

recorded procedure

Link to this item
statement
Regular board meeting called to order at 9:05 am at the Richard S. Bowers building, WCC, 6045 W. County Road E, Dumas. Quorum present; invocation and pledges; no public comments.
topic
Opening and attendance
stage
recorded procedure
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 1

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Bank signatories changed

approved

Link to this item
statement
Unanimous Zimmer/Howard motion authorizes Janet Guthrie, Kristen Blackwell and Dusty Holt at Perryton National Bank and First State Bank and removes Steve Walthour, Dale Hallmark and Kirk Welch.
topic
Bank signatories changed
stage
approved
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 2

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Ogallala Project options

reported

Link to this item
statement
Steve Walthour presented involvement options. Krienke asked directors to consider involvement for July discussion. No motion made.
topic
Ogallala Project options
stage
reported
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 2

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Walthour consulting contract approved

approved

Link to this item
statement
Unanimous Grall/Howard motion approves the two-year contract described as Exhibit A, effective October1,2026 through September30,2028 for $60,000. Contract execution/effectiveness are separately described in the attachment.
topic
Walthour consulting contract approved
stage
approved
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 2

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

EKI consulting contract approved

approved

Link to this item
statement
Unanimous Zimmer/Grall motion approves EKI Environmental and Water consulting contract, described as Exhibit B, effective May11,2026. Attachment legal name is EKI Environment & Water, Inc.
topic
EKI consulting contract approved
stage
approved
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 3

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

November 2026 director-election preparations

scheduled

Link to this item
statement
Precincts1 Dallam,2 Hartley,3 Sherman,4 Moore; notice posting completed May15 ahead of June18 deadline; filing starts July18, election order and filing deadline August17, write-in deadline August21. No motion.
topic
November 2026 director-election preparations
stage
scheduled
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 3

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2025 alternative metering submission

submitted no recorded approval

Link to this item
statement
Item3f expressly considers alternative metering methods submitted by BLF Land LLC for 2025 production and says it was addressed under Item3o. The methods, supporting data and sufficiency determination are not attached. Item3p records no motion after the cross-referenced closed session.
reporting year
2,025
disposition
No motion recorded after closed session; no acceptance or closure established.
topic
2025 alternative metering submission
stage
submitted no recorded approval
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 3, physical p. 11

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Preliminary 2025 district production

reported

Link to this item
statement
Staff reported 2,940 GPU reports, reconfirming approximately200; two recipients with remaining55 GPUs in Dallam/Hartley/Hutchinson not included. Final report expected in July. County/east/west table values have no printed unit and east entries differ between the two displays.
reporting year
2,025
topic
Preliminary 2025 district production
stage
reported
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 3, physical p. 4

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2025 overproduction settlement authority

approved

Link to this item
statement
Unanimous Howard/Grall motion authorizes GM to offer settlements for 2025 overproduction at $25/acre-foot or portion for first offense, $75 second and $225 third. This is general offer authority, not a BLF assessment, accepted settlement or collection.
topic
2025 overproduction settlement authority
stage
approved
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 4

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Active-complete wells approved

approved

Link to this item
statement
Year-to-date Jan1 counts:107 non-exempt permits issued,50 exempt registered,118 non-exempt board-approved. Thirty listed active-complete well records approved on unanimous Grall/Frerich motion as properly equipped and compliant; PLE denotes property-line easement, R replacement. Counts are different measures, not additive.
topic
Active-complete wells approved
stage
approved
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 4, physical p. 5

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

WCC 2025 report presented

reported

Link to this item
statement
David Sloane, Irrigronomy LLC, presented the 2025 demonstration report described as Exhibit C. Inclusion/presentation does not make each scientific assertion a board finding.
topic
WCC 2025 report presented
stage
reported
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 5

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

2026 operations and outreach

reported

Link to this item
statement
Baylee Barnes reported WCC planting, probes and Nutradrip work;1.70 inches rain since April14; all circles/SDI planted June1. Water festivals reached800 students from10 schools with3 sponsors. Master Irrigator cost share distributed $69,182 since prior meeting, with inspections ongoing. No motion.
topic
2026 operations and outreach
stage
reported
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 6, physical p. 7

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Drought-map context

reported

Link to this item
statement
Embedded U.S. Drought Monitor map valid June2,2026 8am EDT and released June4 depicts regional drought categories; credited Adam Allgood NOAA/NWS/NCEP/CPC and Lindsay Johnson NDMC. No district-wide percentage or BLF-specific effect is inferred from the map.
topic
Drought-map context
stage
reported
Date context
Document / item context date
2026-06-02
Source evidence · physical p. 6

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Field-service charts and fuel

reported

Link to this item
statement
Charts report predrills, well inspections and GPUs visited May2025–May2026, county assignments/time and vehicle fuel September2025–May2026. County-time caption dates conflict with chart titles. No motion.
topic
Field-service charts and fuel
stage
reported
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 7, physical p. 8, physical p. 9

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Displayed budget proposal and motion differ

approved with source discrepancy

Link to this item
statement
Displayed proposal raises7009 by$18,000, funded by7102−$8,000 and7203−$10,000. Actual unanimous Zimmer/Howard motion decreases6001 by$5,000,6002 by$8,000,6603 by$7,000 and increases8006 by$20,000. No supplied reconciliation; do not substitute displayed proposal for adopted motion.
topic
Displayed budget proposal and motion differ
stage
approved with source discrepancy
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 9

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

BLF 2023 overproduction

dated unresolved report

Link to this item
statement
BLF GPUs8266,8263,8268,8267: reported Unresolved.
reporting year
2,023
topic
BLF 2023 overproduction
stage
dated unresolved report
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 9

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

BLF plugging

dated unresolved report

Link to this item
statement
BLF HA-5814/GPU8287 not properly plugged by date due in Board Order: reported Unresolved.
reporting year
Unknown / not stated
topic
BLF plugging
stage
dated unresolved report
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 9

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

BLF late 2023 reports

dated unresolved report

Link to this item
statement
BLF listed22 GPUs submitted2023 production reports late: reported Unresolved. GPU9713 is visually read; this is not 2025-method acceptance.
reporting year
2,023
topic
BLF late 2023 reports
stage
dated unresolved report
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 9

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

BLF 2024 overproduction

dated unresolved report

Link to this item
statement
BLF GPUs8263,8266,8268,9623,9933,9935: reported Unresolved.
reporting year
2,024
topic
BLF 2024 overproduction
stage
dated unresolved report
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 10

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Other parties’ technical violations

reported

Link to this item
statement
Chuck Schoonover GPU6433: DA0436 pipe bypass and DA0435 stuck meter with well operating. Dean Cooke/TCW and Katie Roark/Phillips66/WRB GPU9644: HU0609 failed meter/check valve buried; HU0083 reclassified plugged with work due March23,2026 but surface cement cap causing density exceedance. March technician explanation of waiting for tank fill and no change as of June3 are attributed reports. Rows refer to3o; no resulting motion recorded.
observed date
2026-06-03
topic
Other parties’ technical violations
stage
reported
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 10, physical p. 11

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Federal litigation in agenda discussion

discussion

Link to this item
statement
Item3n identifies BLF Land LLC et al. v. Allan Frerich et al., No.2:23-CV-133Z (N.D.Tex., August8,2023), addressed in closed session. It reports no court disposition.
topic
Federal litigation in agenda discussion
stage
discussion
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 10

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Closed-session cross-reference and disposition

no recorded motion

Link to this item
statement
Closed under Government Code551.071 at11:05am to consult counsel on item3 subjects. Source gives reconvening12:35pm and closed-ending/reopening12:36pm. No formal action in closed session; item3p recommendations: No motion was made. This governs the recorded cross-reference from3f, without disclosing deliberations.
topic
Closed-session cross-reference and disposition
stage
no recorded motion
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 11

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Reports, next meeting and adjournment

recorded procedure

Link to this item
statement
Directors reported; no committee reports; GM report said to be in board packet. Next meeting wording says “June meeting” confirmed for July20,2026 at9am. Adjourned1:50pm. President and secretary signatures visible; no separate minutes-approval date printed.
topic
Reports, next meeting and adjournment
stage
recorded procedure
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 11, physical p. 12

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Exhibit label mismatch

source structure

Link to this item
statement
Physical13 says Exhibit A—Technical Violations—Katie Roark Phillips66/WRB and Dean Cooke TCW. Physical14 immediately begins Walthour agreement, while item3c calls that agreement Exhibit A. Do not silently equate or repair the labels.
topic
Exhibit label mismatch
stage
source structure
Date context
Document / item context date
2026-06-16
Source evidence · physical p. 2, physical p. 13, physical p. 14

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Consulting agreement identifies two suits

contract reference

Link to this item
statement
Walthour agreement §1 expressly names BLF Land, LLC et al. v. Allen Frerich et al., No.2:23-CV-133-Z (N.D.Tex.Aug8,2023), and North Plains Groundwater Conservation District v. BLF Land, LLC and Blaine Larsen Farms, Inc., No.25-103-DCCV-5698, in the69th District Court in and for Hartley County, Texas. This is contract-scope attribution, not a petition, docket check, filing date or judgment.
topic
Consulting agreement identifies two suits
stage
contract reference
Date context
Attachment context; not inherited from the June meeting.
Document / item context date
2026-06-16
Source evidence · physical p. 15

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Walthour agreement complete terms

contract terms

Link to this item
statement
Scope covers GM consulting, Ogallala Project leadership/legislative and agency coordination, and litigation technical/historical help with staff/counsel. Progress at least quarterly; monthly hours by10th next month; $150/hour, IRS mileage and eligible travel; total$60,000. Independent contractor responsible for own taxes/employees, no employee benefits. Term Oct1,2026–Sep30,2028; either party30-day written termination; district supplies equipment/personnel. No assignment, Texas law/Moore venue, written changes, prevailing-party fees, severability. Mediation first;69th Judicial District Court of Moore may appoint mediator and hears unresolved contract litigation; jury waived. This contract-dispute venue is distinct from the Hartley BLF case.
topic
Walthour agreement complete terms
stage
contract terms
Date context
Attachment context; not inherited from the June meeting.
Document / item context date
No single item event date supplied
Source evidence · physical p. 14, physical p. 15, physical p. 16, physical p. 17, physical p. 18, physical p. 19, physical p. 20, physical p. 21

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Walthour execution and future effective date

executed

Link to this item
statement
Signatures of Janet Guthrie and Steven Walthour; handwritten execution reads June16,2026. Effective date expressly October1,2026 regardless of execution. Partially masked SSN omitted from derivative extraction; no reconstruction.
effective date
2026-10-01
topic
Walthour execution and future effective date
stage
executed
Date context
Attachment context; not inherited from the June meeting.
Document / item context date
2026-06-16
contract effective date
2026-10-01 — Separate from board action and execution. (physical p. 22)
Source evidence · physical p. 22

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

EKI master agreement complete terms

contract terms

Link to this item
statement
MSA dated May11,2026, signed by Janet Guthrie and Wade Oliver. Executed work authorizations define scope and take precedence for specific project scope; services start execution. Invoices due60days; overdue1% monthly compounded; nonpayment may suspend/terminate. Insurance and professional-care/no-warranty standards, mutual consequential-damage waiver, negligence-based indemnity preserving governmental immunity, no control over construction contractors. Estimates not guaranteed. Client owns paid work product, EKI retains preexisting tools; other-project use at client risk. Confidentiality exceptions and Texas Public Information Act preserved. Cause termination7days, without cause14; earned fees/termination expenses due. Negotiate30days then nonbinding mediation,60day litigation stay, Texas law; written assignment, responsible subcontracting, force majeure/time-bar. Client supplies reliable information/utilities; no third-party rights. AI clause permits supplementary technology with removal of identifying data and human professional judgment.
topic
EKI master agreement complete terms
stage
contract terms
Date context
Attachment context; not inherited from the June meeting.
Document / item context date
2026-05-11
Source evidence · physical p. 23, physical p. 24, physical p. 25, physical p. 26, physical p. 27, physical p. 28

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

EKI litigation support work authorization

signed work authorization

Link to this item
statement
C60159.00-01 dated May11,2026 under MSA; Wade Oliver project manager. As-needed hydrogeologic aquifer/use/impact evaluations using models or other tools, testimony and collaboration. Tasks only when directed by GM/board/counsel; schedule consulted per task. Initial proposed budget$45,000 on time/expense basis, not exceeded without written authorization. Signed district date reads6-11-26; consultant date18 June2026. These attachment dates do not replace June16 board motion or imply actual expenditure.
signature dates 1 · party
District
signature dates 1 · date
2026-06-11
signature dates 1 · basis
handwritten
signature dates 2 · party
EKI
signature dates 2 · date
2026-06-18
signature dates 2 · basis
printed
topic
EKI litigation support work authorization
stage
signed work authorization
Date context
Attachment context; not inherited from the June meeting.
Document / item context date
2026-05-11
signature date
2026-06-11 — District; handwritten (physical p. 29)
signature date
2026-06-18 — EKI; printed (physical p. 29)
Source evidence · physical p. 29, physical p. 30

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

EKI January 2026 schedule of charges

contract rate schedule

Link to this item
statement
Schedule dated January4,2026 incorporated into May11 agreement. Hourly staff classifications preserved in table; direct expenses cost+15%; company car$0.60/mile,truck/4WD$0.75/mile,field vehicle$30/day; personal vehicle federal rate+15%; excise/in-house charges as stated; may update annually. Rates are not BLF liability.
topic
EKI January 2026 schedule of charges
stage
contract rate schedule
Date context
Attachment context; not inherited from the June meeting.
Document / item context date
2026-01-04
Source evidence · physical p. 31

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

Report identity and executive summary

consultant report

Link to this item
statement
NPGCD WCC 2025 Demonstration Program—Testing Drought Tolerant Hybrids and other Technologies, Dr David Sloane/Irrigronomy LLC, June2026. Six hybrids/four regimes with population/fertility changes; summary claims227bu/ac at12.2in and best209bu/ac at9.7in. SDI/pivot and forage comparisons are demonstration findings, not BLF quantities. Summary figures and detailed sections differ in places; retain their scopes.
report date
2026-06
reporting period
2025
attribution
Dr David Sloane, Irrigronomy LLC; embedded NPGCD WCC 2025 demonstration report
topic
Report identity and executive summary
stage
consultant report
Date context
Dr David Sloane, Irrigronomy LLC; embedded NPGCD WCC 2025 demonstration report Reporting period: 2025 Attachment context; not inherited from the June meeting.
Document / item context date
2026-06
Source evidence · physical p. 32, physical p. 33, physical p. 34

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.

PDF page reference · no quotation or image-method claim

Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.