Meeting intelligence · Minutes and attachments
North Plains Groundwater Conservation District
Source meeting date
Date context: Signed June16 minutes; separate minutes approval date not shown. Embedded contracts/report/production dates are separately scoped.
Source-linked research summary. Verify important details against the official source record.
Meeting summary
The June minutes record district administration, consultant approvals, 2025 reporting and well approvals, four separately unresolved BLF compliance categories, other parties’ meter/plugging issues, and no motion after the cross-referenced closed session. The Walthour agreement identifies a Hartley County state case without providing court instruments. Complete attachments include EKI terms and rates and Sloane’s qualified 2025 agricultural demonstration results.
Source evidence · physical p. 2, physical p. 3, physical p. 9, physical p. 10, physical p. 11, physical p. 15, physical p. 32
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Source and dates
- Meeting date · source stated
- 2026-06-16
- Document approval date
- Unknown / not stated
- Routing metadata date
- Unknown
- Extraction date
- 2026-09-28T00:31:27.720849+00:00
- Last official source check
- Unknown / no new source check performed
- Source document
- 93 physical PDF pages · north-plains-watch01-4181603978d4
Source date roles and qualifications
2026-06-16 · recorded meeting date — Whole minutes date, not inherited by every attachment.
Source evidence · physical p. 1
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Exact date not stated · minutes approval date — Signed block gives no separate approvaldate.
Source evidence · physical p. 12
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-06-16 · contract execution date — Handwritten16June2026.
Source evidence · physical p. 22
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-10-01 · contract effective date — Explicitly regardless of execution.
Source evidence · physical p. 2, physical p. 18, physical p. 22
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2028-09-30 · contract term end — Subject to30daytermination.
Source evidence · physical p. 2, physical p. 18
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-05-11 · agreement date — Not June board date.
Source evidence · physical p. 23, physical p. 28
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-06-11 · work authorization signature date — Handwritten district date.
Source evidence · physical p. 30
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-06-18 · work authorization signature date — Printed EKI date.
Source evidence · physical p. 30
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-01-04 · rate schedule date — Incorporated charge schedule.
Source evidence · physical p. 31
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-06 · report month — Day unavailable; reportingperiod2025.
Source evidence · physical p. 32
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2025-12-30 · production report submission date — StatusSubmitted, not approval.
Source evidence · physical p. 93
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026-07-20 · scheduled meeting date — Text says June meeting but names July20; no subsequent completion inferred.
Source evidence · physical p. 12
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Posting, filing, signature, approval, study and referenced dates retain their own roles. They do not automatically conflict with the meeting date.
PDF page fragments are navigation hints; some viewers may open at the beginning.
Source identity: sha256:4181603978d4bb58c99ab5559225fa25c6f474126aa74cee4dded340034e51b3
Source completeness
93 of93physicalpages, allattachments
- issuer
- North Plains Groundwater Conservation District
- source publisher
- North Plains Groundwater Conservation District
- District role
- issuing district
- source acquired at
- Unknown / not stated
- source checked at
- Unknown / not stated
- source check basis
- Individual acquisition/check timestamp unavailable in supplied manifest; run ID retained only as linkage.
Explore Entities and timelines · Dated mentions, without assumed identity merges.
Matters, observations and decisions
Requests, recommendations and approvals retain their recorded labels. A passed motion is a procedural result; conditions are requirements, not proof of fulfillment. Repeated quantities are not added together.
Opening and attendance
recorded procedure
Link to this item- statement
- Regular board meeting called to order at 9:05 am at the Richard S. Bowers building, WCC, 6045 W. County Road E, Dumas. Quorum present; invocation and pledges; no public comments.
- topic
- Opening and attendance
- stage
- recorded procedure
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 1
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Consent agenda approved
approved
Link to this item- statement
- Unanimous Zimmer/Howard motion approves April14 minutes with a typographical correction under 3i (not changing its motion/action), April1–May31 expenditures, Underwood/Kemp Smith payments, Texas Health Benefits 2026–2027 rerate, and Hansford County 2026–2027 collection contract.
- motion · mover
- Bob Zimmer
- motion · seconder
- Mark Howard
- motion · vote
- unanimous
- topic
- Consent agenda approved
- stage
- approved
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 1, physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Bank signatories changed
approved
Link to this item- statement
- Unanimous Zimmer/Howard motion authorizes Janet Guthrie, Kristen Blackwell and Dusty Holt at Perryton National Bank and First State Bank and removes Steve Walthour, Dale Hallmark and Kirk Welch.
- topic
- Bank signatories changed
- stage
- approved
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Ogallala Project options
reported
Link to this item- statement
- Steve Walthour presented involvement options. Krienke asked directors to consider involvement for July discussion. No motion made.
- topic
- Ogallala Project options
- stage
- reported
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Walthour consulting contract approved
approved
Link to this item- statement
- Unanimous Grall/Howard motion approves the two-year contract described as Exhibit A, effective October1,2026 through September30,2028 for $60,000. Contract execution/effectiveness are separately described in the attachment.
- topic
- Walthour consulting contract approved
- stage
- approved
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 2
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
EKI consulting contract approved
approved
Link to this item- statement
- Unanimous Zimmer/Grall motion approves EKI Environmental and Water consulting contract, described as Exhibit B, effective May11,2026. Attachment legal name is EKI Environment & Water, Inc.
- topic
- EKI consulting contract approved
- stage
- approved
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 3
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
November 2026 director-election preparations
scheduled
Link to this item- statement
- Precincts1 Dallam,2 Hartley,3 Sherman,4 Moore; notice posting completed May15 ahead of June18 deadline; filing starts July18, election order and filing deadline August17, write-in deadline August21. No motion.
- topic
- November 2026 director-election preparations
- stage
- scheduled
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 3
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2025 alternative metering submission
submitted no recorded approval
Link to this item- statement
- Item3f expressly considers alternative metering methods submitted by BLF Land LLC for 2025 production and says it was addressed under Item3o. The methods, supporting data and sufficiency determination are not attached. Item3p records no motion after the cross-referenced closed session.
- reporting year
- 2,025
- disposition
- No motion recorded after closed session; no acceptance or closure established.
- topic
- 2025 alternative metering submission
- stage
- submitted no recorded approval
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 3, physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Preliminary 2025 district production
reported
Link to this item- statement
- Staff reported 2,940 GPU reports, reconfirming approximately200; two recipients with remaining55 GPUs in Dallam/Hartley/Hutchinson not included. Final report expected in July. County/east/west table values have no printed unit and east entries differ between the two displays.
- reporting year
- 2,025
- topic
- Preliminary 2025 district production
- stage
- reported
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 3, physical p. 4
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2025 overproduction settlement authority
approved
Link to this item- statement
- Unanimous Howard/Grall motion authorizes GM to offer settlements for 2025 overproduction at $25/acre-foot or portion for first offense, $75 second and $225 third. This is general offer authority, not a BLF assessment, accepted settlement or collection.
- topic
- 2025 overproduction settlement authority
- stage
- approved
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 4
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Active-complete wells approved
approved
Link to this item- statement
- Year-to-date Jan1 counts:107 non-exempt permits issued,50 exempt registered,118 non-exempt board-approved. Thirty listed active-complete well records approved on unanimous Grall/Frerich motion as properly equipped and compliant; PLE denotes property-line easement, R replacement. Counts are different measures, not additive.
- topic
- Active-complete wells approved
- stage
- approved
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 4, physical p. 5
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
WCC 2025 report presented
reported
Link to this item- statement
- David Sloane, Irrigronomy LLC, presented the 2025 demonstration report described as Exhibit C. Inclusion/presentation does not make each scientific assertion a board finding.
- topic
- WCC 2025 report presented
- stage
- reported
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 5
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
2026 operations and outreach
reported
Link to this item- statement
- Baylee Barnes reported WCC planting, probes and Nutradrip work;1.70 inches rain since April14; all circles/SDI planted June1. Water festivals reached800 students from10 schools with3 sponsors. Master Irrigator cost share distributed $69,182 since prior meeting, with inspections ongoing. No motion.
- topic
- 2026 operations and outreach
- stage
- reported
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 6, physical p. 7
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Drought-map context
reported
Link to this item- statement
- Embedded U.S. Drought Monitor map valid June2,2026 8am EDT and released June4 depicts regional drought categories; credited Adam Allgood NOAA/NWS/NCEP/CPC and Lindsay Johnson NDMC. No district-wide percentage or BLF-specific effect is inferred from the map.
- topic
- Drought-map context
- stage
- reported
- Date context
- Document / item context date
- 2026-06-02
Source evidence · physical p. 6
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Field-service charts and fuel
reported
Link to this item- statement
- Charts report predrills, well inspections and GPUs visited May2025–May2026, county assignments/time and vehicle fuel September2025–May2026. County-time caption dates conflict with chart titles. No motion.
- topic
- Field-service charts and fuel
- stage
- reported
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 7, physical p. 8, physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Displayed budget proposal and motion differ
approved with source discrepancy
Link to this item- statement
- Displayed proposal raises7009 by$18,000, funded by7102−$8,000 and7203−$10,000. Actual unanimous Zimmer/Howard motion decreases6001 by$5,000,6002 by$8,000,6603 by$7,000 and increases8006 by$20,000. No supplied reconciliation; do not substitute displayed proposal for adopted motion.
- topic
- Displayed budget proposal and motion differ
- stage
- approved with source discrepancy
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
BLF 2023 overproduction
dated unresolved report
Link to this item- statement
- BLF GPUs8266,8263,8268,8267: reported Unresolved.
- reporting year
- 2,023
- topic
- BLF 2023 overproduction
- stage
- dated unresolved report
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
BLF plugging
dated unresolved report
Link to this item- statement
- BLF HA-5814/GPU8287 not properly plugged by date due in Board Order: reported Unresolved.
- reporting year
- Unknown / not stated
- topic
- BLF plugging
- stage
- dated unresolved report
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
BLF late 2023 reports
dated unresolved report
Link to this item- statement
- BLF listed22 GPUs submitted2023 production reports late: reported Unresolved. GPU9713 is visually read; this is not 2025-method acceptance.
- reporting year
- 2,023
- topic
- BLF late 2023 reports
- stage
- dated unresolved report
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 9
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
BLF 2024 overproduction
dated unresolved report
Link to this item- statement
- BLF GPUs8263,8266,8268,9623,9933,9935: reported Unresolved.
- reporting year
- 2,024
- topic
- BLF 2024 overproduction
- stage
- dated unresolved report
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 10
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Other parties’ technical violations
reported
Link to this item- statement
- Chuck Schoonover GPU6433: DA0436 pipe bypass and DA0435 stuck meter with well operating. Dean Cooke/TCW and Katie Roark/Phillips66/WRB GPU9644: HU0609 failed meter/check valve buried; HU0083 reclassified plugged with work due March23,2026 but surface cement cap causing density exceedance. March technician explanation of waiting for tank fill and no change as of June3 are attributed reports. Rows refer to3o; no resulting motion recorded.
- observed date
- 2026-06-03
- topic
- Other parties’ technical violations
- stage
- reported
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 10, physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Federal litigation in agenda discussion
discussion
Link to this item- statement
- Item3n identifies BLF Land LLC et al. v. Allan Frerich et al., No.2:23-CV-133Z (N.D.Tex., August8,2023), addressed in closed session. It reports no court disposition.
- topic
- Federal litigation in agenda discussion
- stage
- discussion
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 10
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Closed-session cross-reference and disposition
no recorded motion
Link to this item- statement
- Closed under Government Code551.071 at11:05am to consult counsel on item3 subjects. Source gives reconvening12:35pm and closed-ending/reopening12:36pm. No formal action in closed session; item3p recommendations: No motion was made. This governs the recorded cross-reference from3f, without disclosing deliberations.
- topic
- Closed-session cross-reference and disposition
- stage
- no recorded motion
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 11
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Reports, next meeting and adjournment
recorded procedure
Link to this item- statement
- Directors reported; no committee reports; GM report said to be in board packet. Next meeting wording says “June meeting” confirmed for July20,2026 at9am. Adjourned1:50pm. President and secretary signatures visible; no separate minutes-approval date printed.
- topic
- Reports, next meeting and adjournment
- stage
- recorded procedure
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 11, physical p. 12
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Exhibit label mismatch
source structure
Link to this item- statement
- Physical13 says Exhibit A—Technical Violations—Katie Roark Phillips66/WRB and Dean Cooke TCW. Physical14 immediately begins Walthour agreement, while item3c calls that agreement Exhibit A. Do not silently equate or repair the labels.
- topic
- Exhibit label mismatch
- stage
- source structure
- Date context
- Document / item context date
- 2026-06-16
Source evidence · physical p. 2, physical p. 13, physical p. 14
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Consulting agreement identifies two suits
contract reference
Link to this item- statement
- Walthour agreement §1 expressly names BLF Land, LLC et al. v. Allen Frerich et al., No.2:23-CV-133-Z (N.D.Tex.Aug8,2023), and North Plains Groundwater Conservation District v. BLF Land, LLC and Blaine Larsen Farms, Inc., No.25-103-DCCV-5698, in the69th District Court in and for Hartley County, Texas. This is contract-scope attribution, not a petition, docket check, filing date or judgment.
- topic
- Consulting agreement identifies two suits
- stage
- contract reference
- Date context
- Attachment context; not inherited from the June meeting.
- Document / item context date
- 2026-06-16
Source evidence · physical p. 15
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Walthour agreement complete terms
contract terms
Link to this item- statement
- Scope covers GM consulting, Ogallala Project leadership/legislative and agency coordination, and litigation technical/historical help with staff/counsel. Progress at least quarterly; monthly hours by10th next month; $150/hour, IRS mileage and eligible travel; total$60,000. Independent contractor responsible for own taxes/employees, no employee benefits. Term Oct1,2026–Sep30,2028; either party30-day written termination; district supplies equipment/personnel. No assignment, Texas law/Moore venue, written changes, prevailing-party fees, severability. Mediation first;69th Judicial District Court of Moore may appoint mediator and hears unresolved contract litigation; jury waived. This contract-dispute venue is distinct from the Hartley BLF case.
- topic
- Walthour agreement complete terms
- stage
- contract terms
- Date context
- Attachment context; not inherited from the June meeting.
- Document / item context date
- No single item event date supplied
Source evidence · physical p. 14, physical p. 15, physical p. 16, physical p. 17, physical p. 18, physical p. 19, physical p. 20, physical p. 21
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Walthour execution and future effective date
executed
Link to this item- statement
- Signatures of Janet Guthrie and Steven Walthour; handwritten execution reads June16,2026. Effective date expressly October1,2026 regardless of execution. Partially masked SSN omitted from derivative extraction; no reconstruction.
- effective date
- 2026-10-01
- topic
- Walthour execution and future effective date
- stage
- executed
- Date context
- Attachment context; not inherited from the June meeting.
- Document / item context date
- 2026-06-16
- contract effective date
- 2026-10-01 — Separate from board action and execution. (physical p. 22)
Source evidence · physical p. 22
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
EKI master agreement complete terms
contract terms
Link to this item- statement
- MSA dated May11,2026, signed by Janet Guthrie and Wade Oliver. Executed work authorizations define scope and take precedence for specific project scope; services start execution. Invoices due60days; overdue1% monthly compounded; nonpayment may suspend/terminate. Insurance and professional-care/no-warranty standards, mutual consequential-damage waiver, negligence-based indemnity preserving governmental immunity, no control over construction contractors. Estimates not guaranteed. Client owns paid work product, EKI retains preexisting tools; other-project use at client risk. Confidentiality exceptions and Texas Public Information Act preserved. Cause termination7days, without cause14; earned fees/termination expenses due. Negotiate30days then nonbinding mediation,60day litigation stay, Texas law; written assignment, responsible subcontracting, force majeure/time-bar. Client supplies reliable information/utilities; no third-party rights. AI clause permits supplementary technology with removal of identifying data and human professional judgment.
- topic
- EKI master agreement complete terms
- stage
- contract terms
- Date context
- Attachment context; not inherited from the June meeting.
- Document / item context date
- 2026-05-11
Source evidence · physical p. 23, physical p. 24, physical p. 25, physical p. 26, physical p. 27, physical p. 28
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
EKI litigation support work authorization
signed work authorization
Link to this item- statement
- C60159.00-01 dated May11,2026 under MSA; Wade Oliver project manager. As-needed hydrogeologic aquifer/use/impact evaluations using models or other tools, testimony and collaboration. Tasks only when directed by GM/board/counsel; schedule consulted per task. Initial proposed budget$45,000 on time/expense basis, not exceeded without written authorization. Signed district date reads6-11-26; consultant date18 June2026. These attachment dates do not replace June16 board motion or imply actual expenditure.
- signature dates 1 · party
- District
- signature dates 1 · date
- 2026-06-11
- signature dates 1 · basis
- handwritten
- signature dates 2 · party
- EKI
- signature dates 2 · date
- 2026-06-18
- signature dates 2 · basis
- printed
- topic
- EKI litigation support work authorization
- stage
- signed work authorization
- Date context
- Attachment context; not inherited from the June meeting.
- Document / item context date
- 2026-05-11
- signature date
- 2026-06-11 — District; handwritten (physical p. 29)
- signature date
- 2026-06-18 — EKI; printed (physical p. 29)
Source evidence · physical p. 29, physical p. 30
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
EKI January 2026 schedule of charges
contract rate schedule
Link to this item- statement
- Schedule dated January4,2026 incorporated into May11 agreement. Hourly staff classifications preserved in table; direct expenses cost+15%; company car$0.60/mile,truck/4WD$0.75/mile,field vehicle$30/day; personal vehicle federal rate+15%; excise/in-house charges as stated; may update annually. Rates are not BLF liability.
- topic
- EKI January 2026 schedule of charges
- stage
- contract rate schedule
- Date context
- Attachment context; not inherited from the June meeting.
- Document / item context date
- 2026-01-04
Source evidence · physical p. 31
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
Report identity and executive summary
consultant report
Link to this item- statement
- NPGCD WCC 2025 Demonstration Program—Testing Drought Tolerant Hybrids and other Technologies, Dr David Sloane/Irrigronomy LLC, June2026. Six hybrids/four regimes with population/fertility changes; summary claims227bu/ac at12.2in and best209bu/ac at9.7in. SDI/pivot and forage comparisons are demonstration findings, not BLF quantities. Summary figures and detailed sections differ in places; retain their scopes.
- report date
- 2026-06
- reporting period
- 2025
- attribution
- Dr David Sloane, Irrigronomy LLC; embedded NPGCD WCC 2025 demonstration report
- topic
- Report identity and executive summary
- stage
- consultant report
- Date context
- Dr David Sloane, Irrigronomy LLC; embedded NPGCD WCC 2025 demonstration report Reporting period: 2025 Attachment context; not inherited from the June meeting.
- Document / item context date
- 2026-06
Source evidence · physical p. 32, physical p. 33, physical p. 34
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
PDF page reference · no quotation or image-method claim
Physical PDF page reference supplied with the extraction; no exact quotation or per-page image method is asserted.
